Orange County NC Website
ARTICLE 4 <br />C4NTRACT,SUM <br />4.1 The Owner shall pay the Contractor in current funds for the Contractor's pecforlnance of the Contract the Contract Sum of <br />One Hundred Ninety-Four Thousand, One Hundred Eleven ~~ <br />~: 194, 111.00 ), subject to additions and deductions as provided in the Con- <br />tract Documents. <br />4.2 The Contract Sum is based upon the following aitemates, if any, which are described in the Contract Documents and are <br />hereby accepted by the Owner: <br />(State the numbers or other tdentijttatlon ojaccepted alternates. /Jdecistons on other alternates are to be made by. the Owner subsequent to the execution of <br />this .agreement, attach a schedule of such other alternates showing the amount jor each and the dale unit! which that amount, is valid.) <br />None <br />4.3 Unit prices, if any, are as follows: <br />Unit prices are as noted on the proposal form. <br />AlA DOCUMENT A101 •OWNER-CONTRACTOR AGREEMENT • TWELFTH EDtTiON • AtA• • ©1987 A~~~~1987 3 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 <br />WAFINING: Unlicensed photocopying violates U.S. copyright laws snd Is subject to legal prosecution. <br />