Browse
Search
Agenda - 10-19-1999 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 10-19-1999
>
Agenda - 10-19-1999 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2008 2:21:15 PM
Creation date
10/21/2008 2:19:58 PM
Metadata
Fields
Template:
BOCC
Date
10/19/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 19991019
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 6 <br />FINAL PAYMENT <br />Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) <br />the Contract has been fully performed by the Contractor except for the Contractor's responsibility to rnrrect nonconforming <br />Work as provided In Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessazlly <br />survive final payment; and (2) a final Cert~cate for Payment has been issued by the Architect; such final payment shall be made by <br />the Owner not more than 3~ days after the issuance of the Architect's final Certificate for Payment, or as follows: <br />ARTICLE T <br />MISCELLANEOUS PROVISIONS <br />T.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the ref- <br />erence refers to that provision as amended or supplemented by other provisions of the Contract Documents. <br />7.2 Payments due and unpaid under the Contract shall beaz Interest from the date payment is due at the rate stated below, or in <br />the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. <br />(insert rate of interest agreed upon, ij any.) <br />(Usury taws and requirements under the Federal Truth to Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and <br />GontraUOr's principal places of business, the location of the ProJeU and elsewhere may ajject the validity ojtbts provision. Legal advice should be obtained <br />with respect to deletions or modijtcattons, and also regarding requirements such as written disclosures or waivers.) <br />T.3 Other provisions: <br />None. <br />ARTICLE 8 <br />TERMINATION OR SUSPENSION <br />8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. <br />8.2 The Work may be suspended by the Owner as provided in Article t4 of the General Conditions. <br />AIA DOCUMF_NT A101 •OWNER-CONTRACTOR AGREEMENT • 1'WE[.FCH EDtTiON • AIA• • ©t987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.c. zooo6 A101-1987 5 <br />WARNING: Unikenaed otatocopvirw violates U.S. copyright laws end is sut>fect to legal prosectttttm. <br />
The URL can be used to link to this page
Your browser does not support the video tag.