Orange County NC Website
ARTICLE 1 <br />THE CONTRACT DOCUMENTS <br />The Contract Documents consist of this Agrcemcnt, Conditions of the Contract (General, Supplementary and other Conditions), <br />Drawings, Specifications, addenda issued prior to execution of this Agreement, other documents listed in this Agreement and <br />Modifications issued after execution of this Agrcemcnt; these form the Contract, and are as fully a part of the Contract as if attached <br />to this Agreement or repeated herein. The Contract represents the. entire and integrated agreement between the parties hereto <br />and supersedes prior negotiations, tcptrsenations or agreements, either written or oral. An rnumetation of the Contract Documents, <br />other than Modifications, appeals in Article 9: <br />ARTICLE 2 <br />THE WORK OF THIS CONTRACT <br />Consists of furnishing all labor, materials and equipment necessary to .perform <br />the remedial roofing of selected areas of 501/503 West Franklin St. Chapel Hill, <br />North Carolina. The work will include replacement of all slate, asphalt shingles, <br />and select areas of low-slope roof systems, removal of all terra cotta coping, <br />and installation of new copper coping, including all related flashings, sheet metal, <br />and trim. All work to be performed per plans and specifications dated <br />September 14, 1999. <br />ARTICLE 3 <br />DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br />3.1 The date of commencement is the date from which the Conttxet Time of Paragraph 3.2 is measured, and shall be the date of <br />this Agreement, as first written above, unless a differertt date is stated below oc provision is made for the date to be fixed in a notice <br />,to proceed issued by the Owner. <br />(lnsM the date of commencement, Ij It dtjjerx jrom the date of tbls Agreement or, tj appllcab{e, state. fbat the date w!!I be jlxed to a notice to pi+aceed.) <br />The date will be fixed in a Notice to Proceed. ~ ~~ <br />Unless the. date of commcnoement is established by a notice to proceed Lssued by the Owner, the Conuactor shall notify the <br />Owner Tn writing not kxs than five days before commencing the Work to permit the timely filing of mortgages, mechanic's liens <br />and other security interests. <br />3.2 The Contractor shall.achieve Substantial Completion of the entire Work not later than <br />(Insert the calerrdardate or rtumberojtatendardaysajterfbedate ojcommeruemenL Also Desert any requirements jor earlterSubstanttal Completion ojcer- <br />tatrt porttont of the Work, tj nat stated Nseurberr trt the tontrau Documents) <br />90 Calendar Days <br />subject to adjustments of this Contract Time as provided in the Contract Documents. <br />(Insert prur•lstuns, ij arry, jar liquidated damages relating to jatlure to complete un Ume.) <br />Liquidation damages will be assessed at a rate of $200.00 per day, for each and <br />every day, the project remains incomplete beyond the scheduled completion date, as <br />noted above. <br />AfA OOCUMEIYT A101 • OWNER•CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA• • Q1987 A1O1-19$7 2 <br />THE AMERICAN INSTITUTE OF ARC{{ITECTS, 1735 NEW YORK AVENUE,. N.W., WASHINGTON, D.C. 20p{Xi <br />WARNING: UMicenscd photocopying violates U.S. twpyr{ght taws and t< std,leet to ieyal prosecution. <br />