Orange County NC Website
a required minimum pedestrian/landscape space of <br />25,339 square feet. The Board finds that the site <br />plan indicates 103,800 square feet of <br />pedestrian/landscape space. <br />B. Article 8.2.4 of the Orange County Zoning Ordinance <br />requires: <br />a) that applicants for a special use permit show the <br />methods and adequacy of provisions for sewage <br />disposal facilities, solid waste and water service. <br />The Board finds that the site will not be a staffed <br />facility, and therefore water and sewer disposal <br />facilities will not be necessary. <br />b) that an applicant for a special use permit show the <br />method and adequacy of police, fire and rescue squad <br />protection. The Board finds that fire protection <br />for the proposed tower site would be provided by <br />Orange Grave Fire Department; rescue service by <br />Orange County Emergency Management; and police <br />protection by the Orange County Sheriff's <br />Department. <br />c) that an applicant for a special use permit show the <br />method and adequacy of vehicle access to the site <br />and traffic conditions around the site. The Board <br />finds that the site plan indicates a 12-foot access <br />drive that leads out to N.C. 54. <br />9. Article 8.8.17a of the Orange County Zoning Ordinance <br />sets out specific requirements which must be submitted as <br />part of an application a telecommunications tower as a <br />special use. <br />a) A site plan must be submitted, showing site and size <br />of all existing structures within 500 feet of the <br />site, existing and proposed topography at a contour <br />interval of five feet and any officially designated <br />floodways and floodplains, or the presence of <br />alluvial soils. The Board finds that the site plan <br />shows the structures along with topography. The <br />Board further finds that there are no floodways, <br />floodplains or alluvial soils indicated on the plan. <br />b) Plans, and elevations for all proposed structures <br />and descriptions of the color and nature of all <br />exterior material. The Board finds that the <br />application indicates there will be one equipment <br />cabinet, and that the proposed tower will be a light <br />steel gray. <br />4 <br />