Browse
Search
Agenda - 10-19-1999 - 8d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 10-19-1999
>
Agenda - 10-19-1999 - 8d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2008 12:36:17 PM
Creation date
10/21/2008 12:36:03 PM
Metadata
Fields
Template:
BOCC
Date
10/19/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
Minutes - 19991019
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q9t?9t1999 1~t:27 9196a~3~116 ORr~NGE CO PUBLIC 4J0 <br />From: Cary Sundedane Te: wiibett mcadou [date: 9127169 Time:12:3R:iQ PM <br />{919a 477 7031 <br />September 24, 19519 <br />1N'ilbert Mc,A,doolWayne Fentin <br />Qra~nge County 1'ubiic '~TVarks <br />i-lighway 8h Ird'artk~ <br />I;Iillsboraugh, NC 2?278 <br />Dear v4lilbertlt~Ta3nne, <br />i~l'P, NC 27709 <br />wwNasunderiartder~g.com <br />'VV'e are pleased to submit this proposal to you far design services pestaisaing to the Ceiling <br />replacement and religbting prrrject at the P'l.anning and Agriculture Center in 1:Iillsbtu'o~ugb, NC. <br />Included in this letter is an outline of the proposed design s+~rvices, fee rcqui~zemeats and expected <br />Schedule. <br />Sunderland t`ngineering gilt provide services to you to invesfiigate the existing co~nditiazYS and <br />prepare canstructiazt documents fq~r the project. Included in the design services is all work required <br />to complete the hid docunaems, construction drawings, details, aztd specifications far the project <br />which is defined as 11,5U(f sgft nmovatirnt with panelhaaxd replacement, ceiling grid installation, <br />light fi~cture and diffusor repl,aoetnent. Also. included are bid negotiations, snap drawing review and <br />constructiaa observation as required. throughout ttte completion of the prvjec#. <br />Sunderland Engineering will complete the work described above for a fixed fee of $rd54Q.04, <br />pins expenses for document preparation.. We will provide additional services for any further work <br />as recluestad an an hourly basis, based on the rate of $75.011 p~ hour for engiaocring services and <br />$45.00 per hour for drafting services. <br />We area competent and z~liable firm, able to begirx work and complete the project as expected <br />and according to schedule. We appreciate this opportunity and lank forward to oc'xtgnning work <br />with you on the project. Flease cal! me with any questions you may have regarding the conteart of <br />this proposat, I would be giaGd tv provide further informafiion. <br />Sincerely, <br />Gaty L. Stmd+etland, PE <br />file 1Ui106 <br />ENGINEERING <br />o.a~ <br />,_' <br />
The URL can be used to link to this page
Your browser does not support the video tag.