Browse
Search
Agenda - 10-19-1999 - 8d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 10-19-1999
>
Agenda - 10-19-1999 - 8d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2008 12:36:17 PM
Creation date
10/21/2008 12:36:03 PM
Metadata
Fields
Template:
BOCC
Date
10/19/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
Minutes - 19991019
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY. <br />BOARD OF COMMISSIONERS <br />ACTION. AGENDA ITEM ABSTRACT <br />.Meeting Date: October 19,1999 <br />Action Agenda <br />Item No. g d_ <br />SUBJECT: Professional services authorization; design of ceiling replacement and relighting project <br />at Planning and Ag Building <br />DEPARTMENT: Purchasing & Central Services PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): <br />Proposal from Sunderland <br />INFORMATION CONTACT: <br />Pam Jones ,Purchasing Director, ext 2652 <br />Wilbert McAdoo, Public Works Director ext 2625 <br />TELEPHONE NUMBERS: <br />Hillsborough 732-8181 <br />Chapel Hill 968-4501 <br />Durham 688-7331 <br />Mebane 336-227-2031 <br />___ <br />PURPOSE: To consider authorizing the use,, of Sunderland Engineering to completed design work <br />associated with the installation of a new suspended ceiling and the renovation of the electrical system at <br />the Planning and Agriculture Building at 306 Revere Road, Hillsborough. <br />BACKGROUND: The Planning and Ag Building was converted from a grocery store to county offices in <br />the late 1980's. For the most part, the original renovation, maintained the existing lighting and electrical <br />service that served the grocery store. In most areas of the building, for example, the eight foot (8') <br />florescent tube light fixtures are turned off at a central location rather than in individual offices. This sets <br />up the inefficient requirement that much of the building must be lighted when the use of only a single <br />office or conference room is needed. The lighting service will be upgraded to allow light operation to be <br />located within the offices. <br />In order to bring the light closer to the work space and provide a more even lighting pattern, suspended <br />ceilings with lay-in fixtures will be installed in the areas of the building where they do not presently exist. <br />The building ~is also scheduled to receive an upgrade to the HVAC system. The suspended ceilings will <br />allow the duct work to be installed more easily and less obtrusively. The HVAC work will be scheduled to <br />coincide with .the ceiling/electrical renovation work so the new ceiling will not be damaged by the <br />installation of new ducts. <br />Since the building will remain open for business during this period, sequencing of the work will be <br />prescribed to the contractor to minimize business disruptions to the resident departments and their <br />public. <br />Sunderland Engineering has submitted a proposal to: <br />• design and complete all specifications, drawings and other construction documents necessary to bid <br />this work, and '^ <br />e work with bidders in the event negotiations are necessary after bids have been received; and <br />• provide construction observation and management as the project proceeds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.