Orange County NC Website
the suer system with respect to the ~ro~ert~ covered b~ the <br />Sewer Easement and Agreement signed b~ them within 30 dais <br />of .notification that connection can be made. Acreage Fees <br />shall be laid b~ the user with a completed and signed Efland <br />Sewer System Sewer Easement and Agreement. <br />D. Stub-out Service Line Fee [~i:a]. <br />Each person, firm, or corporation <br />connecting to the system thereafter user or users) shall ~a~ <br />a stub-out service line fee in an amount equal to the <br />administrative and construction cost to Drange County of <br />installing a service line. This fee shall- be based on the <br />out-of-docket cost to Drange County far installing the <br />service line plus an allocated cost equal to the <br />administration cost to Drange County of having the <br />installation accomplished. The original 212 potential Efland <br />Area 5ewer,S~stem customers who have provided Drange Caunt~ <br />with an a~~lication fox sewer service to the Efland Sewer <br />System and who have provided Drange County with a <br />signed and acknowledged Efland. Sewer System Sewer <br />Easement and Agreement but have not been connected <br />to the system because their ~ro~ert~ affected b~ <br />