Orange County NC Website
3 <br />.lob 5379 -Orange County Animal Services <br />Bid Tabulation ' <br />8" 1_andfill .Senitanr Sewer <br />--n'1 -~---_-- <br />------ <br />Bidder Sillin s & Garrett CSSI Pioeline Utilities <br />Base Sid $ 238,850.00 $ 242,308.00 $ 304,844.00 <br />Jack & Bore dirt Bubanks $ 11,730.00 INCL INCL - <br />Jack & Bore (dirtjRR $ 62,865.00 INCL INCI <br /> $ 311,445.00 $ 242,308.00 $ 304,844.00 <br />AI[owances $ 4,560.00 $ 5,450.00 $ 5,220.00 <br />Total $ 318,008.00 $ 247 758.00 $ 310,064.00 <br /> <br /> <br /> <br /> <br />BIIIIn s & Garrent 8~ CSSI Gnl <br />RR Insurance INCL INCI_ INCL <br />S S ing INCL INCL INCL- <br />R&R As haI~DOT Roadwa <br /> <br />erosion Control _ <br />_ <br />' <br />Dewatering <br />Clearin <br />R&R Chain Link Fence <br />Traffic Control <br />Tempos Stream Crossing <br />Pettnanent Stream Crossing <br />Tle to Existin Manhole 12-14 <br />4" PVC Flare ASS w/Slab <br />.~ anhole 12-14 CSSI Onl <br />Gas Manhole 8-10 Stream Crossin <br />5' MH 0-6, 6-8, 8-10, 10-12, 14-14 (Drop} Rlp Rap <br />4' MH 0-6 Tn:e Fence <br />4° PVC Clean Out C350 Stabilization Fabric <br />6" SDR Seedin & Mulching <br />g" pip Locates <br />Mobilization Clean Out w/Mfnl Manhole <br /> St trt Drain l3er-irig~ C~at~ ruR <br /> Asphalt L-et. -i- <br />- R&R Gravel Drive <br /> Check 13tair} A~vt <br /> R&R Chain Link Fence <br />5379: Bid-Tab:9-23-08:ar <br />