Orange County NC Website
ATTACHMENT 1 <br />3 <br />• Specific project <br />merits: <br />➢ <br />2025 Current <br />Trend Plan or a project being considered in Tier II Analysis <br />for 2025 Transportation <br />Plan <br />➢ <br />Degree of congestion); <br />➢ <br />Safety issues-, <br />➢ <br />Promotes National <br />Highway System; <br />➢ <br />Reduces use <br />of single occupancy vehicles; <br />➢ <br />Provides for <br />more transportation choices; <br />➢ <br />Promotes energy <br />conservation; <br />➢ <br />Has minimal <br />impact on the natural environment; <br />➢ <br />Encourages <br />economic development; <br />➢ <br />Adverse impacts <br />do not disproportionately affect low income populations; <br />➢ <br />Transportati <br />n Improvement Program Status; <br />➢ <br />Type of transit <br />project (transit r)roiects onlv). <br />A subcommittee of the TCC will meet Friday, November 12 to develop a <br />recommendation based on a technical analysis of each project. The <br />subcommittee will present the results of the technical analyses and the <br />subcommittee's recommendation to the TCC at the November 17, 1999, <br />meeting; the TCC will make a recommendation to the Technical Advisory <br />Committee at its December 8, 1999, meeting. <br />The TAC will recornmend a Regional Priority List to be available for public <br />comment for a four week period. After the public comment period, the TAC will <br />approve a Regiona Priority List to be forwarded to NCDOT for consideration in <br />the development of he DCHC 2002 — 2008 MTIP. <br />Attachment 4 is the 1999 -2005 Regional Priority List from which projects in the <br />1999 -2005 DCHC IVITIP were taken. The MTIP is updated biannually (there was <br />no update nor priority list update last year). <br />Staff will submit an pdate on the MTIP and process for the December 7, 1999, <br />Board of County Co missioners agenda. <br />