Browse
Search
Agenda - 11-09-1999 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 11-09-1999
>
Agenda - 11-09-1999 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 11:21:40 AM
Creation date
10/16/2008 2:32:52 PM
Metadata
Fields
Template:
BOCC
Date
11/9/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 19991109
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction & Demolition Materials Management <br />November 9, 1999 <br />Table of Contents <br />Executive Summary <br />1. Status of C &D Management in Orange County <br />A. Waste Characterization <br />B. Waste Tonnage Projections <br />C. Current Recycling and Waste Reduction Practices <br />D. Connection to Integrated Solid Waste Management Plan/Goals <br />2. Temporary Options for C &D Management (key issues /costs) <br />A. Temporary option until new landfill developed <br />1) placing C &D in MSW landfill <br />2) suspension of acceptance of C &D <br />3) amending existing C &D landfill permit to allow modest vertical expansion <br />4) hauling C &D to Durham Transfer Station (this option was mentioned at a BOCC <br />meeting, however, staff level discussions with City of Durham have concluded <br />that this may not be an option that Durham's staff would recommend to their <br />Manager /Council) <br />B. Temporary option until MSW landfill full (assumes C &D will go into MSW landfill) <br />C. Temporary option of developing new C &D site (with capacity to coincide with <br />remaining MSW capacity) <br />3. Long Term Options for C &D Management (key issues /costs) <br />A. Selecting Eubanks Rd. Site <br />B. Permanently Ceasing C &D Management <br />C. C &D Transfer Station <br />D. Joint C &D/MSW Transfer Station <br />E. Regional Solutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.