Browse
Search
Agenda - 10-14-2008 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-14-2008
>
Agenda - 10-14-2008 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2008 4:27:39 PM
Creation date
10/15/2008 4:25:19 PM
Metadata
Fields
Template:
BOCC
Date
10/14/2008
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20081014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
48 <br />credit 2 Development Density 8~ Community Connectivity <br />credits Brownfield Redevelopment <br />credit 4 Alternative Transportation <br />1 A. Public Transportation Access (1 point) <br />1 B. Bicycle Storage & Commuting (1 Point) <br />C. Low Emitting & Fuel Efficient Vehicles (1 Point) <br />r1 D. Parking Capacity (1 Point) <br />1 E. Delivery Service (1 Point) <br />~ ' ' F. Incentives (1 Point) <br />1 G. Car-Share Membership (1 Point) <br />'1 H. Alternative Transportation Education (1 Point) <br />credit 5.1 Site Development, Protect or Restore Habitat <br />1 credit s.2 Site Development, Maximize Open. Space <br />1 ; credit s.1 Stormwater Design, Quantity Control <br />1 -. '' Credit s.2 Stormwater Design, Quality Control <br />1 credit 7.1 Heat Island Effect, Non-Roof <br />1 credit 7.2 Heat Island Effect, Non-Roof <br />Credit 7.s Heat Island Effect, Non-Roof <br />credit 7.a Heat Island Effect, Roof <br />credits Light Pollution Reduction <br />13 - Subtotal <br />1' Credit 1.1 <br />1 Credit 1.2 <br /> Credit 2 <br />1 Credit 3.1 <br /> Credit 3.2 <br />3 Subtotal <br />Water Efbcient Landscaping, Reduce by 50% <br />Water Efficient Landscaping, No Potable Use or No Irrigation <br />Innovative Wastewater Technologies <br />Water Use Reduction, 20% Reduction <br />Water Use Reduction, 30% Reduction <br />Energy & Atmosphere 17 Possible Points <br />1 ' Prereq 1 Fundamental Commissioning of the Building Energy Systems <br />1 Prereq 2 Minimum Energy Pertormance Required <br />1 Prereq s Fundamental Refrigerant Management Required <br /> credit 1 Optimize Energy Pertormance <br /> credit 2 On-Site Renewable Energy <br />1 credits Enhanced Commissioning <br /> credit 4 Enhanced Refrigerant Management <br />1 credits Measurement & Verification <br /> credits Green Power <br />'5' Subtotal <br />Water Efficiency 5 Possible Points <br />Materials & Resources 13 Possible Points <br />>'' 1 Prereq 1 Storage ~ Collection of Recyclables Required <br />Credit 1.1 Building Reuse, Maintain 75% of Existing Walls, Floors ~ Roof <br />Credit 1.2 Building Reuse, Maintain 95% of Existing Walls, Floors ~ Roof <br />
The URL can be used to link to this page
Your browser does not support the video tag.