Browse
Search
Agenda - 10-14-2008 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-14-2008
>
Agenda - 10-14-2008 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2008 4:27:39 PM
Creation date
10/15/2008 4:25:19 PM
Metadata
Fields
Template:
BOCC
Date
10/14/2008
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20081014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44 <br />As part of the Project, the developer shall submit a detailed Utility Master <br />Plan for review and approval to the City of Mebane and Orange County <br />outlining the appropriate steps that will be taken to provide water service <br />to the remaining Districts prior to the recording of the Class A SUP <br />documents. <br /> <br />Sewer Collection will be supplied to the Project in a phased format consistent <br />with the District phasing outlined herein. <br />The following sewer improvements have been preliminary identified as being <br />necessary to support the Project: <br />District I: <br />District I will be served with a temporary private pump station and force <br />main. The private line will discharge into the existing gravity sewer on the <br />west side of Buckhorn Road. <br />District 11 <br />Development of District II will require the extension of the ten inch (10") <br />gravity line from the Gravely Hill pump station to the east side of the <br />property. <br />Sewer easements shall be obtained and this will be a public line. <br />Upgrade to the current GE pump station, north of 140/85 and off of <br />Industrial Drive, will most likely be required to accept this additional flow. <br />District III <br />Development of District III will require the extension of a force main from <br />the intersection of West Ten and Buckhorn Road to the new Regional <br />Pump Station, and require an upgrade to the Gravely Hill Station. <br />Additional improvements to serve the Project may be required upon the <br />submission and review of comprehensive utility management plans by <br />Orange County and the City of Mebane. <br />Utilities shall be designed in accordance with City of Mebane Standards. <br />Any and all bonding of internal and external utility improvements shall be in <br />accordance with Section A of this document. <br />
The URL can be used to link to this page
Your browser does not support the video tag.