Orange County NC Website
13 <br />will be responsible for monitoring and enforcing acceptable waste management <br />practices, <br />2. BRA shall demonstrate compliance with the Orange County Regulated <br />Recyclable Materials Ordinance (RRMO) regardless of permitting jurisdiction <br />(Chapter 34 Article III of the Orange County Code of Ordinances), <br />3. BRA shall develop a Solid Waste Management Plan for each portion of the <br />Project for review and approval by Orange County Solid Waste, regardless of <br />permitting jurisdiction, for the life of the Project. <br />Specifically, this plan shall address how land clearing, demolition, and <br />construction wastes will be disposed of and that recyclables and waste <br />generation rates be considered in planning for waste collection services <br />regardless of waste or recycling provider, <br />4. Prior to the commencement of earth disturbing activities on the property, BRA <br />shall hold a deconstruction assessment meeting with Orange County staff <br />concerning the removal of existing buildings from the property. <br />5. All site plans shall contain a note indicating the following: <br />"Prior to any demolition or construction activity on the site the <br />applicant will hold a deconstruction assessment conference with <br />the County's Solid Waste staff concerning buildings to be removed <br />from this site. " <br />6. BRA shall provide both internal and external space for collection of solid waste <br />and recyclable materials. Materials collected shall be at least equivalent to the <br />services provided by Orange County Solid Waste. <br />7. Waste collection areas shall be located in such a manner as to provide <br />convenient access for users of the facility and .safe passage for service <br />vehicles. <br />8. The following notes shall be placed on all submitted site plan: <br />a. `Any gate design will include gate retainers.' <br />b. `The user will be responsible for opening gates to the dumpster <br />area on collection days of any material(s) to be collected from this <br />location.' <br />c. `If any vehicles are parked in the refuse or recyclables collection <br />vehicle access area, the containers will not receive service until the <br />next scheduled collection day.' <br />d. `Orange County will not be responsible for any pavement damage <br />that may result from service vehicles.' <br />e. `By Orange County Ordinance, clean wood waste, scrap metal and <br />corrugated cardboard, all present in construction waste, must be <br />recycled. ` <br />