Act Orig Rem Early Early 2008 2009
<br /> Description FEB : MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY
<br /> ID Dur Dur Start Finish
<br /> ' 1 , i , ,
<br /> 1200 OWASA Permit 20d 20d 15FEB08 13MAR08 ' i OWASA Permi
<br /> ,
<br /> I r, .
<br /> 1010 Grading Permit 24d 24d 15FEB08 19MAR08 - Grading Permit. , . , • "
<br /> 1000 Bid&Award Site Pkgs. 35d 35d 18FEB08 04APR08 g' ":-..- Bid&Award Site Pkgs. _ ' I ' . ' 3
<br /> I .
<br /> 1020 Pre Clearing Meeting 1d 1d 07APR08 07APR08 ,1, Pre Clearing Meeting' ' ; ' ' 3 ; ' - '
<br /> i . . 3 - t . . . , !
<br /> 1150 Field Enginering 5d 5d 07APR08 11APR08 ' , ' Field Enginering , 1 : t ` ,
<br /> 1030 Erosion Control/Tree Prot 10d 10d 08APR08 21APR08 Erosion Control/Tree Prot '
<br /> ,
<br /> = 1•- - _ ;
<br /> •
<br /> 1080 16"Water Line Jack&'Bore 20d 20d 14APR08 09MAY08 1 16"Water Line Jack&'Bore
<br /> 1050 Temporary Road 2d 2d 22APR08 23APR08 ; - _ Temporary Road 1 t : 3 s 1 - _ ' ' t
<br /> I 1-i , ' i 1 . , ; s
<br /> 1130 Temporary Fencing 3d 3d 22APR08 24APR08 Temporary Fencing
<br /> ` - ' , Clear,Stri &Grade Site t 1 ;
<br /> 1040 Clear,Strip&Grade Site 20d 20d 22APR08 19MAY08 E -1-,----=;:--- -7-7,.p
<br /> 1180 Remove Asphalt Paving 1d 1d 20MAY08 20MAY08 ' I-la Remove sphalt Paving i ' :
<br /> 1 1 ! t 1 ' I
<br /> 1110 8"Water Line w/Jack&Bore 5d 5d 20MAY08 26MAY08 s 8"Water Line w/Jack&Bore ;•- . 1 II 1, ' 1 , 1 , , . , .
<br /> 1060 Retention Pond 10d 10d 20MAY08 02JUN08 ` , 1—nl l Retention Pond - 1 ; , 1
<br /> 1 I , ; . I1 ; , ' . . , ' 1
<br /> 1210 Construct Building 186d 186d 20MAY08 06FEB09 -— ``""' "" �' Construct Building' ' '
<br /> 1 3 c - : I u T�' ,—— t — ; . t ;• - C ildmg
<br /> 1. I
<br /> 1070 Storm Drainage 10d 10d 03JUN08 16JUN08 , 1 ; , - Storm Drainage: . , . ; I 4
<br /> I
<br /> 1090 Site Water Line 10d 10d 17JUN08 30JUN08 s ' ; = F ■ Site Water Line? , ; 1 , ; 4 ' 4 I - '
<br /> , . - { s • •1 1 , I ,
<br /> 1120 Fire Line,Hydrants&and BFP 5d 5d 01JUL08 08JUL08 � ' I . Fire Line,Hydrants&and BFP ', `
<br /> . I I 3 1 i ` , e . i
<br /> 1100 Sanitary 10d 10d 01JUL08 15JUL08 ISanitaryi
<br /> 1140 Sleeves For Parking Lot Lights 1d 1d 16JUL08 16JUL08 ' I ' ' • ' ' G Sleeves For Parking Lot LightJ €
<br /> • : _ , ; , :G- , 13 , . , ,4
<br /> ' , 1 , ' ` ' ` I JCurb,Gutter&Paving, -
<br /> 1160 Curb,Gutter&Paving 17d 17d 03DEC08 26DEC08 ; _ ; , ,
<br /> 1190 Gravel Walkways 3d 3d 29DEC08 31 DEC08 - . ` ' € t ' : I ' ! ; , y -11.1 Gravel Walkways , - ! ,
<br /> 1170 Site Concrete,Pads&Walks 10d 10d 29DEC08 12JAN09 ' • ' ' , € ' Site Concrete,Pads&Walks
<br /> 1 ' 1
<br /> Start date 15FEB08 O Early bar
<br /> Finish date 06FEB09 Clancy & Theys Construction Company ® Progress bar
<br /> Data date 15FEB08
<br /> Run date 15FEB08 Orange County Animal Services ti Critical bar
<br /> Page number 1A February 15, 2008 ....,Summary bar
<br /> O Start milestone point
<br /> ©Primavera Systems,Inc. 0 Finish milestone point