Browse
Search
2008-091 Purchasing- Clancy & Theys Construction Manager at Risk Services Animal Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-091 Purchasing- Clancy & Theys Construction Manager at Risk Services Animal Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 2:26:37 PM
Creation date
10/9/2008 2:41:42 PM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4j
Document Relationships
Agenda - 02-19-2008-4j
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 02-19-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard Estimate Report Clancy& Theys Const. Co. <br /> 07042 OCAS 211812008 10:03 AM <br /> Page 3 <br /> Total <br /> Item Description Takeoff Qty Amount <br /> Rough Grading 193,957 <br /> 1,409.756 Labor hours <br /> 1,029.533 Equipment hours <br /> 2250 Rock Excavation <br /> 30 Rock Excavation-Allowance 1.00 is 10,100 <br /> Rock Excavation 10,100 <br /> 0.20 Labor hours <br /> 0.20 Equipment hours <br /> 2255 Unsuitable Material Excav <br /> 10 Unsuitable Material Excavation- 1.00 is 10,100 <br /> Allowance <br /> Unsuitable Material Excav 10,100 <br /> 2270 Erosion Control <br /> 10 Construction Entrance 1.00 ea 2,020 <br /> 20 Silt Fence 895.00 if 5,201 <br /> 30 Diversion Ditch/Earth Berms 500.00 if 3,368 <br /> 40 Inlet Protection 20.00 each 3,438 <br /> 50 Sediment Basin 200.00 cy 4,858 <br /> 80 Temporary Seeding 4.00 acre 6,060 <br /> ---- Rip Rap Aprons 6.00 ea 2,727 <br /> ---- Rip Rap 30.00 ton 1,364 <br /> Erosion Control 29,036 <br /> 358.655 Labor hours <br /> 53.571 Equipment hours <br /> 2552 Storm Drain <br /> 10 Storm Drain 50.00 if 4,545 <br /> 10 Storm Drain 1,177.00 if 106,992 <br /> 10 Biofiltration Cell&Detention 1.00 is 40,401 <br /> Area <br /> Storm Drain 151,938 <br /> 2602 Gravel Paving <br /> 10 Gravel Drive&Laydown Area 19,500.00 sf 49,239 <br /> Gravel Paving 49,239 <br /> 2710 Fencing <br /> 10 Construction Site Fencing 1,790.00 if 18,079 <br /> Fencing 18,079 <br /> SITEWORK 568,056 <br /> 3,199.431 Labor hours <br /> 2,143.484 Equipment hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.