Orange County NC Website
Standard Estimate Report Clancy& Theys Const. Co. <br /> 07042 OCAS 211812008 10:03 AM <br /> Page 2 <br /> Total <br /> Item Description Takeoff Qty Amount <br /> BID PACKAGE 2A <br /> 1000 GENERAL CONDITIONS <br /> 1555 Traffic Control <br /> ---- Traffic Control 1.00 is 3,788 <br /> Traffic Control 3,788 <br /> GENERAL CONDITIONS 3,788 <br /> 2000 SITEWORK <br /> 2005 Field Engineering <br /> 10 Field Engineering 1.00 is 4,419 <br /> Field Engineering 4,419 <br /> 2100 Clearing&Grubbing <br /> 10 Clearing&Grub 5.00 acre 39,414 <br /> 30 Selective Tree Removal 39.00 ea 13,230 <br /> Clearing&Grubbing 52,644 <br /> 684.00 Labor hours <br /> 556.00 Equipment hours <br /> 2101 Tree Protection <br /> 10 Tree Protection Fencing 895.00 if 4,430 <br /> Tree Protection 4,430 <br /> 89.50 Labor hours <br /> 2120 Site Demolition <br /> 170 Remove Asphalt Paving 2,839.00 sy 8,651 <br /> Site Demolition 8,651 <br /> 189.267 Labor hours <br /> 94.633 Equipment hours <br /> 2200 Stripping&Respread <br /> 20 Strip to Haul Off(Ito 10 Miles) 4,388.00 cy 35,462 <br /> Stripping&Respread 35,462 <br /> 468.053 Labor hours <br /> 409.547 Equipment hours <br /> 2210 Rough Grading <br /> 10 Cut to Fill(1 to 5 Acres) 642.00 cy 5,188 <br /> 10 Cut to Fill(1 to 5 Acres) 6,136.00 cy 49,582 <br /> 50 Cut to Haul Off(1 to 10 miles) 11,480.00 cy 139,187 <br />