Browse
Search
2008-091 Purchasing- Clancy & Theys Construction Manager at Risk Services Animal Services Facility
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-091 Purchasing- Clancy & Theys Construction Manager at Risk Services Animal Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 2:26:37 PM
Creation date
10/9/2008 2:41:42 PM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4j
Document Relationships
Agenda - 02-19-2008-4j
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 02-19-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ <br />_ Please return this copy to - <br />Clerk to the Board's office for PAF <br />ORANGE COUNTY AGREEMENT FOR CONSTRUCTION <br />NORTH CAROLINA MANAGER AT RISK SERVICES <br />This AGREEMENT is made and effective on this date: February 19'h, 2008 <br />BETWEEN The Owner: <br />ORANGE COUNTY, NORTH CAROLINA (hereinafter referred to as "Owner" or "the Owner") <br />And the Construction Manager At Risk (hereinafter referred to as "CMAR" or "the CMAR"): <br />CLANCY & TREYS CONSTRUCTION COMPANY, INC. <br />For services in connection with the Project known as: <br />~~4~ a/r9~aod~ <br />~-~ <br />The ORANGE COUNTY ANIMAL SERVICES FACILITY SITE CONSTRUCTION, Chapel Hill, North <br />Carolina, as further described in Article 2 <br />For which the Designer is: <br />DIXON WIENSTEIN ARCHITECTS, P.A., ATTN: ELLEN WIENSTEIN, 25 THE COURTYARD, CHAPEL <br />HILL, NC 27516 <br />The Owner and CMAR, in consideration of their mutual covenants herein, agree as set forth below: <br />TABLE OF CONTENTS <br />ARTICLE 1 -RELATIONSHIP OF THE PARTIES ......................................................................................... 4 <br />1.1 Owner and Construction Manager At Risk <br />1.2 Owner and Designer <br />1.3 CMAR and Contractors <br />1.4 Relationship of the CMAR to the Designer <br />ARTICLE 2 -PROJECT DEFINITION .................................. <br />ARTICLE 3- CONSTRUCTION MANAGER AT RISK'S SERVICES ............... <br />3.1 CMAR Services <br />3.2 CMAR Personnel <br />3.3 Construction Management Plan <br />3.4 Consultant Selection <br />3.5 Time Management <br />3.6 Cost Management <br />3.7 Management Information System (MIS) <br />3.8 Design Phase Services <br />3.9 Procurement Phase <br />3.10 Construction Phase <br />3.11 Post Construction Phase <br />........................ 4 <br />............. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.