Orange County NC Website
<br /> <br />Section IV -Schedule of Deliverables <br />Deliverables shall include: <br />1. Security System Layout that outlines the integrated security systems for the <br />Justice Expansion. <br />2. Construction Documents that include a fmal set of drawings, request-for- <br />proposal and specifications submitted as a package. <br />3. Documentation of meetings and conversations regarding all aspects of this <br />project. <br />4. Project status reports. <br />5. Punch-list of installation problems and/or vendor problems. <br />6. Statement of installed system condition. <br />7. As-built documentation. RMA will review for accuracy the as-built documents <br />for the facilities prior to conveyance to the owner. Following RMA's review, <br />the contractors will provide as-built documents to Orange County in both paper <br />and electronic formats. <br />6 <br />N <br />L <br />0 <br />O <br />_~ <br />3 <br />t <br />V <br />I <br />O <br />._ <br />• <br />• <br />~.N.~.~. <br />fre~secuetyix~n <br />