Orange County NC Website
~O <br />Phase 3 -Construction (23%~ <br />11. Review shop drawings and submittals. <br />12. Conduct four meetings and/or site visits to assist the Project Manager as security <br />project overseer for installation of conduit, wiring, and security system <br />equipment. <br />Phase 4 -Record Documentation /System Acceptance ,10%~ <br />13. Conduct one site visit to inspect and evaluate installed security system <br />equipment, develop a final punch-list, and approve system when completed and <br />performing as specified. <br />14. Review and approve as-built documentation. <br />4 <br />Y <br />L <br />~F• <br />Q <br />0 <br />V <br />V <br />• <br />• <br />~L'~ti - <br />rnsasecu~ltycom <br />