Craig Benedict: Article 8 has to do with the special use permits. There are some general <br /> criteria within special use permits, which will be part of the findings of fact process. There is <br /> part of Article 8 that says when you do a Class A Special Use Permit for a Planned <br /> Development please refer back to Article 7 again. So, Article 7 is the guiding specific aspects <br /> of what type of information you have to provide for a planned development special use permit <br /> application. When this returns back to you, there will be general and specific Article 8 findings <br /> of fact, which have to do with health, safety, and welfare. That's not part of the material that <br /> you're getting tonight. In quick reference to site-specific development plans, that does not <br /> pertain to planned developments in special use permits, it pertains to a specific project single <br /> use and that is within the evidence that's provided within the document. We can re-clarify that <br /> by the next meeting also. <br /> Commissioner Gordon: Where is the site-specific development plan? <br /> Craig Benedict: For planned developments, you provide a development concept plan and that <br /> • development concept plan is a master plan that explains the utilities, open space, transportation <br /> systems, land use compatibility. For planned developments, you do not go down to a site- <br /> specific development plan. That is when a site plan is submitted when you actually have a <br /> request for a building permit. <br /> Commissioner Gordon: But when are the Commissioners going to get the specific findings of <br /> fact that have to go with Article 8? •I haven't looked it up, so I can't tell you for sure, but I <br /> thought that there were specific provisions of Article 8 that you had to reference and yet it isn't <br /> here. So, if we close the public hearing and we don't have that and we find out that we need it <br /> or want it, then it won't be in the record. So, I'm not sure what the recourse would be except to <br /> open everything else up again, which I don't think is something we'd rather do. So, as I said, <br /> there's a planned development part, and there's a special use part. And you said that we're <br /> going to get into Article 8 Findings of Fact when it comes back, but we don't have those things <br /> documented here now. <br /> Geof Gledhill: Let me take a shot. The applicant and those who spoke in favor and against <br /> this project have the burden, if you will, of making sure that all of the evidence is in the record <br /> that's necessary for you to make the findings of fact that the ordinance requires. If one or the <br /> other of those has failed in doing that and you can't make the requisite findings of fact, then you <br /> don't make the requisite findings of fact. That's how this process works. It's not an interactive <br /> process that goes on until you make a decision. At some point you cut off the public hearing <br /> process and cut off the evidence being presented, and that's what's being proposed tonight. <br /> The staff is giving you its best opinion, if you will, that all of the evidence is necessary for you to <br /> make the decisions you need to make in the record. If you disagree with that, then that's the <br /> way you vote. <br /> Commissioner Gordon: I know, but that would be unfortunate. It's hard for me to tell, the way <br /> it's laid out, because Article 8 is not referenced. I'm not sure how this site-specific plan is going <br /> to be handled. <br /> Geof Gledhill: The site-specific plan is not something you'll decide about. Each site-specific <br /> plan for the project will go through the site-specific process in the zoning ordinance, which is a <br /> professional staff review. The staff will review the site-specific plan as it's submitted, or plans, <br /> as they're submitted, and approve them based on the technical requirements of the ordinance <br /> and the conditions that you've imposed in the approval of the special use permit. <br />