Browse
Search
Agenda - 10-07-2008 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-07-2008
>
Agenda - 10-07-2008 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:37:48 AM
Creation date
10/7/2008 12:22:34 PM
Metadata
Fields
Template:
BOCC
Date
10/7/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes - 20081007
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or $194,000 per ton of installed capacity. Hillsborough County sole-sourced to <br />----nta a new GOOTPD line to add to the two operating 600 TPD lines already in <br />place. The cost to Hillsborough County for the new line will be $123 million or <br />,OOO <br />per installed ton of capacity. The project is expected toba completed, tested <br />and accepted bv the County in July 2OO9' <br />4.2.9 Fairbanks North Star Borough, AK <br />The Fairbanks North Star Borough (F0BB) is soliciting proposals for optimizing the <br />management of the MGVV stream. The F |SG is seeking a long-term partnership to <br />innp|annant a method for economical disposal of the community's y4SVV while <br />returning energy savings to the Borough - with an emphasis on waste reduction, <br />recycling and VV[Eoptions. Proposals were due May 39,2OO8. <br />The following dates represented the FNGB's beet estimate of the schedule being <br />followed to select the successful proposer for this project. <br />Proposal Evaluations June 1 - July 31, 2008 <br />Notice of Intent to Award (NOIA) Issued August 2008 <br />Contract Negotiations August/September2000 <br />Assembly Approval of Contract Award Septennbe[/Oc±ober2OO8 <br />Contract Execution November 2008 <br />After the Notice of Intent to Award has been issued, the Borough and the successful <br />offeror shall conduct good faith negotiations to address all aspects of a resulting <br />contract. Should the Borough be unable to negotiate a contract with the successful <br />offeror, negotiations will be formally terminated. The Borough may then initiate <br />negotiations with the second highest ranked offeror. This process may continue until <br />an agreement isreached. <br />4.2.10 City of Tallahassee, FL <br />The City of Tallahassee, FL, aPubUc Power Community, in November 2006 issued a <br />letter of interest to seven project developers requesting a two-page summary for <br />consideration of their technology for development of a renewable energy facility <br />serving the City of Tallahassee's service territory within Leon County, FL The City <br />received three'written responses, all from developers using biomass as fuel for <br />conventional steam generation- Two additional companies made formal <br />presentations to City representatives for advanced gasification projects, one project <br />utilizing PlSVV and the other utilizing woody biomass as fuel sources. In January <br />2007, the City began direct negotiations with one of the companies that made the <br />formal presentations, Green Power Systems based in Jacksonville, Florida. In June <br />of 2007, the City approved the contract for Green Power Systems to begin <br />development of 1,000 TPD plasma gasification plant generating 35 MW net' The <br />purchase power agreement for the sale of electricity to the City of Tallahassee was <br />signed in June 3007. To data, Green Power Systems is conducting geo-technical <br />work on site suitability as well as design and engineering work based on site <br />suitability. Financing has been secured for the development of the plant, and it is <br />scheduled to begin operation in October 2D1O. <br />GBB/CO8027-01 21 August 15, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.