Orange County NC Website
proven technology as a minimum requirement for making capital available to the <br />In October 2OOG, the Authority solicited Proposals from qualified, firms <br />in the refuse management and power facility construction and operation fields to <br />provide for the construction, testing, operation and maintenance of new refuse <br />power plant (RPP) capacity for the counties. The Authority had pre-qualified eight <br />technologies for this solicitation. <br />The facilities were to be owned by the Authority and leased to the successful <br />Pnoposer (Company) on a long-term basis (at least 20 years from thcommercial operationdahs). The site was tobe provided bv the Authority. The Authority would <br />provide most of <br />the refuse (fuel) under a put-or-pay contract and would apply <br />residues for beneficial use as daily cover atthe counties' landfills. <br />The Company would have the rights to all or a portion of the energy revenues (as <br />specified by it in its proposal) and all of the excess waste disposal capacity that could <br />be used to dispose of non-residential waste from any other Authority jurisdiction. <br />In response to the directives, proposals were requested for the following three <br />facility options: <br />° A 90OTPDresource recovery facility to be located in Frederick County to <br />* <br />A 600 TPD resource recovery facility to be located in Carroll County to process <br />residential and commercial waste generated in Carroll County; or <br />A 1,500 TPD resource recovery facility to be located in Carroll County to <br />process residential and commercial waste generated in both Frederick and <br />Carroll Counties. <br />After receipt of proposals from three vendors, the Authority, in conjunction with the <br />participating jurisdictions, completed an initial review of the proposals and short- <br />listed <br />Covanta Energy and VVhee|abnaborTechno|ogies' As part ofthe initial review, <br />the Authority met with Covanta and VVhedabratorto clarify their proposals and to <br />ensure that the initial financial modeling results correctly represented their proposals <br />time f report, and mat the needs of the local jurisdictions. of the rn� o this jurisdictions. As s repo , the <br />Authority � <br />is currently seeking approvals from the jurisdictions to begin formal <br />negotiations with the vendors to arrive at a final contract to be voted on by the <br />jurisdictions' <br />Commissioners. If approved by the jurisdictions, the permitting and <br />construction of the facilities could take up to five years. <br />4.2.2 Harford County, MD <br />In May 2006, the Northeast Maryland Waste Disposal Authority (Authority) began a <br />search for nnns with Qualified .e""="y'^~ to provide — expansion -- of the WTE <br />facility for Harford County, similar to the process conducted for Frederick and Carroll <br />counties (see 5.2.1 above). <br />In December 2006, The Authority issued a Request for Proposals (RFP) fora <br />Resource Recovery Facility ��QF� located in Harford County, Maryland. This vvasthe <br />' ' �b� procurement being conducted by the <br />second step in the two-step competitive p -' <br />18 August 15, 2008 <br />GBE�CO8O2/-01 , <br />