Browse
Search
Agenda - 10-07-2008 - 6e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-07-2008
>
Agenda - 10-07-2008 - 6e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2008 12:21:27 PM
Creation date
10/7/2008 12:20:41 PM
Metadata
Fields
Template:
BOCC
Date
10/7/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6e
Document Relationships
Minutes - 20081007
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
RES-2008-071 Approving Orange Co Transp Priority List for 2011-2017 Transp Improvement Prog
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 7 <br />ORANGE COUNTY TRANSPORTATION PRIORITY LIST ~~~ <br />FOR AREAS WITHIN <br />THE TRIANGLE AREA RURAL PLANNING ORGANIZATION <br />FOR CONSIDERATION OF FUNDING IN <br />THE 2009 - 2015 TRANSPORTATION IMPROVEMENT PROGRAM <br />1) Buckhorn Road (SR 1114) Widening: Widen from US 70 to West Ten Road (SR <br />1144) to a multilane facility with bicycle and pedestrian facilities. This stretch of <br />roadway borders the western boundary of the 1=85/Buckhorn Road Economic <br />Development District EDD). This area is the focus of a growing problem of traffic <br />backing up on the northbound exit ramps of I-85 caused by northbound traffic exiting <br />I-85 onto southbound Buckhorn Road and turning left into a nonconforming business <br />use just south of the interchange. With increased interest in extending water and <br />sewer, and reconsidering proposed uses within the EDD, improvements to the <br />transportation system to support plans for that district are necessary to attract the <br />desired development. Improvements are also needed for the safety of increasing <br />pedestrian travel in this corridor. The improvements will especially be needed with <br />increased traffic related to the new middle school and soccer fields on the north side <br />of West Ten Road. <br />2. Efland Cedar Grove Road (SR 1004 SR 1357) straighten and make turn lane <br />im rovements~~make more direct connection to Interstate 85. Traffic has increased <br />approximately 170% over the past ten years on Efland-Cedar Grove Road just north <br />of US 70, with the greatest increase between 1997 and 1999 when average annual <br />daily traffic (AADT) increased from 2000 to 4200, a 110% increase over the two year <br />period. The most recent AADT counts show a 14% over the period from 1999 to <br />2001. Much of that traffic "dog-legs" through Efland on Forrest Avenue to Mt. Willing <br />Road to access Interstate 85. Mt. Willing Road provides an at grade crossing of the <br />North Carolina Railroad corridor, the only access across the railroad tracks between <br />Hillsborough and Buckhorn Road. (The I-85/US 70 Connector just east of Efland is <br />not accessible to traffic on eastbound US 70.) <br />3. Dai land Road/Oran a Grove Road/Buckhorn Road bic cle lanes: construct 4-ft. <br />paved shoulders along the following route from Garrboro to West Ten Road to <br />provide a cbnnecfiion with proposed routes to Mebane and Effand. <br />• Dai land Road SR 1112 - SR 1113 - SR 1177 from Union Grove Ghurch Road <br />to Orange Grave Road (SR 1006); <br />Oran a Grove Road SR 1006 from Dai land Road SR 1177 to Buckhorn <br />Road~SR„~1114~,; and <br />• Buckhorn Road (SR 1114) to Wesfi Ten Road SR 1144 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.