Browse
Search
Agenda - 10-07-2008 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-07-2008
>
Agenda - 10-07-2008 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2008 12:06:25 PM
Creation date
10/7/2008 12:01:49 PM
Metadata
Fields
Template:
BOCC
Date
10/7/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes - 20081007
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> P1~4NNING BOARD EVIDENCE SUBMITTED ADMINISTRATION <br />FINDINGS Findings: TO SUPPORT FINDINGS RECOMMENDED <br /> Findings: <br /> <br /> <br />g) Grading and Erosion <br />Control <br />G1. Plans for grading and x Yes No The Planning Board voted x Yes No <br />erosion control shall unanimously to make an <br />comply with standards affirmative finding based on <br />contained in the Orange the following: <br />County Erosion and <br />Sediment Control A permit will be issued by the <br />Ordinance and Manual Orange county Erosion <br />and, if applicable, The Control Division prior to the <br />North Carolina Erosion.. start of any land disturbing <br />and 'Sedimentation activity <br />Control Program rules; <br />G2. Construction shall be x Yes No The Planning Board voted x Yes No <br />phased to minimize unanimously to make an <br />disturbance and affirmative finding based on <br />sedimentation; the following: <br /> An erosion control plan, along <br /> with the sequence of the <br /> various construction projects, <br /> is part of the Erosion Control <br /> Permit. <br />G3. Sediment control x Yes No The Planning Board voted x Yes No <br />measures shall be unanimously to make an <br />properly installed to affirmative finding based on <br />filter sediment from the following: <br />runoff during <br />construction and Sediment control measures <br />maintained until grading will be installed as indicated <br />is complete and a on the Erosion Control Plan. <br />permanent vegetative <br />cover has been <br />established and all <br />slopes stabilized; and <br />G4. Permanent landscaping, x Yes No The Planning Board voted x Yes No <br />groundcover, mulch, unanimously to make an <br />etc. shall be installed as affirmative finding based on <br />soon as practical after the following: <br />construction activities <br />for each phase are Landscaping and groundcover <br />completed. will be installed in accordance <br /> with the sequence in the <br /> Erosion Control Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.