Browse
Search
Agenda - 10-07-2008 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-07-2008
>
Agenda - 10-07-2008 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2008 12:06:25 PM
Creation date
10/7/2008 12:01:49 PM
Metadata
Fields
Template:
BOCC
Date
10/7/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes - 20081007
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br />PLANNING BOARD EVIDENCE SUBMITTED <br />FINDINGS Findings: TO SUPPORT FINDINGS <br />E4.Concentrated <br />stormwater, conveyed <br />by ditches, channels, <br />pipes, swales or other <br />conveyance systems <br />must be dispersed and <br />diffuse flow <br />reestablished prior to <br />discharge into a stream <br />buffer; <br />E5. Nitrogen load <br />contribution must be <br />held to 3.6 Ibs per acre <br />per year. <br />x Yes No <br />x Yes No <br />The Planning Board voted <br />unanimously to make an <br />affirmative finding based on <br />the following: <br />The applicant testified over the <br />use of the level spreader to <br />diffuse stormwater flow and <br />that no land clearing work <br />would be near the identified <br />stream buffer. <br />The Planning Board voted <br />unanimously to make an <br />affirmative finding based on <br />the following: <br />The nitrogen load for the <br />project will be consistent with <br />local and State requirements <br />f) Drainage <br />F1. All drainage structures <br />will be installed and <br />maintained according to <br />the approved <br />Stormwater <br />Management Plan. <br />x Yes No <br />The Planning Board voted <br />unanimously to make an <br />affirmative finding based on <br />the following: <br />The applicant testified that a <br />grading and storm drainage <br />plan was submitted for review <br />and approval by Orange <br />County Erosion Control and <br />shall be adhered to. <br />F2. School projects that <br />include retention and/or <br />detention ponds shall <br />comply with the <br />requirements in Section <br />6.23.4, Operation and <br />Maintenance of <br />Structural Best <br />Management Practices. <br />x Yes No <br />The Planning Board voted <br />unanimously to make an <br />affirmative finding based on <br />the following: <br />The applicant testified that the <br />school will maintain the <br />retention basin area. <br />ADMINISTRATION <br />RECOMMENDED <br />Findings: <br />x Yes No <br />x Yes No <br />x Yes No <br />x Yes No <br />
The URL can be used to link to this page
Your browser does not support the video tag.