Browse
Search
Agenda - 10-07-2008 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-07-2008
>
Agenda - 10-07-2008 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:36:49 AM
Creation date
10/7/2008 11:58:26 AM
Metadata
Fields
Template:
BOCC
Date
10/7/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20081007
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
USE <br />Retail Equivalent <br />Conversion Factor <br />(30,000 sq ft) <br />0067 units sq. ft. <br />Residential <br />200 units <br />retail <br />.0128 units sq. ft <br />Theater <br />385 seats <br />retail <br />.0053 units sq/ ft <br />Hotel <br />160 rooms <br />retail <br />2. That the conversion does not result in an increase of the traffic estimates as <br />identified herein, and <br />3. All minimum requirements associated with the development of the Project, <br />as detailed herein, are adhered to. <br />Any changes over these limits shall be construed as a 'Major Modification' of the <br />PD/SUP and shall be processed in accordance with the applicable standards of the <br />Ordinance. <br />F — LAND USE INTENSITY: <br />In addition to all other applicable requirements, the Project shall adhere to a Site <br />Volume Ratio (SVR) of One (1) as detailed within the Orange County Zoning <br />Ordinance. <br />While individual development districts may exceed the SVR of One (1) requirement, <br />the overall Project shall demonstrate compliance. Each site plan, proposing the <br />development or re-development ofthe Project, shall contain detailed <br />informationdemonstrating how the overall Project SVR of One (1) will be achieved <br />and not exceeded. <br />G — SOLID WASTE MANAGEMENT: <br />In addition to any and all applicable Federal, State, or local requirements, the <br />following specific standards shall govern solid waste management issues for the <br />Project: <br />1. BRA shall enter into a Memorandum of Agreement with the County and the <br />City of Mebane outlining the proper disposal methodology for solid waste <br />management. This agreement will outline the necessary interim and long-term <br />11M <br />
The URL can be used to link to this page
Your browser does not support the video tag.