Browse
Search
Agenda - 10-07-2008 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-07-2008
>
Agenda - 10-07-2008 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:36:49 AM
Creation date
10/7/2008 11:58:26 AM
Metadata
Fields
Template:
BOCC
Date
10/7/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20081007
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT THREE C (3C) - CONDITIONS OF APPROVAL (COA) <br />The following is a detailed list of the various conditions recommended by the <br />ADMINISTRATION concerning the approval of this project. <br />These special terms and conditions shall encumber the development. and bind the <br />owners and lessees, as well as their successors. These special terms and conditions <br />are required to be mutually agreed to by the Developer in order to be imposed. <br />It needs to be remembered, however, that the developer is required to develop this <br />project, including any and all internal and external improvements, in accordance with: <br />1. The provisions of the Orange County Zoning and Subdivision Regulations, <br />including the Economic Development District Design Manual and <br />2. Any and all applicable Federal, State, and local regulations. <br />These special terms and conditions are the only regulatory guidelines that are subject <br />to review and approval by the applicant. <br />If this project is approved all concept plans, reports, renderings, comments, <br />commitments, and supporting documentation contained within the record of the <br />Project's approval shall be incorporated and made a part of the Class A Special Use <br />Permit (hereafter 'SUP'). <br />Please refer to Attachment Three E (3E) the Special Use Permit for a detailed <br />description of all recommended conditions along with renderings and examples of <br />various standards for review and comment. <br />With that, the following special terms and conditions are recommended for the approval <br />of the Buckhorn Village Planned Development project: <br />A — OWNERSHIP AND MANAGEMENT: <br />1. BRA and/or their successors, by restrictive covenant or otherwise, shall <br />incorporate the various conditions and development standards, as detailed <br />herein, into all leases and/or individual sale documents ensuring the perpetual <br />adherence to all terms and conditions of this SUP and guaranteeing unified <br />control of the Project. <br />2. There shall be no subdivision of any portion of the Property, including all property <br />within any of the three (3) development districts, until the installation of all <br />required infrastructure has been completed. Provided, however, any subdivision <br />permitted by this SUP shall be subject to the requirement that the entire Property <br />be subject to unified control. For purposes of this Section A.2., "infrastructure" <br />shall mean as follows: <br />ig <br />
The URL can be used to link to this page
Your browser does not support the video tag.