Orange County NC Website
to modify/alter <br />existing design <br />standards and <br />because it is not <br />proposing a <br />specific use . of <br />property. This is a <br />master/concept <br />plan proposing the <br />overall <br />development of a <br />parcel of property <br />through the <br />various provisions <br />contained in Article <br />Seven (7) of the <br />Ordinance. <br />8.8 b) Elevations of all <br />On August 13, 2008 the <br />The Administration <br />makes a <br />proposed structures to be <br />Planning Board voted <br />unanimously to make an <br />recommendation for <br />used in the development. <br />affirmative Indicating <br />an affirmative <br />X Yes <br />No that the Applicant had X Yes <br />No finding based on <br />information contained <br />submitted the necessary <br />architectural renderings <br />within the record <br />within the application <br />outlining the proposed <br />height, construction <br />materials. and elevations <br />Of the proposed <br />structures. <br />8.8 c) — Twenty-six (26) <br />On August 13, 2008 the <br />The ' Administration <br />makes a <br />copies of the Environmental <br />Planning . Board voted <br />unanimously to make an <br />recommendation for <br />Assessment and/or. <br />Environmental Impact <br />affirmative Indicating <br />an affirmative <br />No finding based on <br />Statement, if required, by X Yes <br />No that the Applicant had Yes <br />information contained <br />the . Orange County <br />submitted the necessary <br />documentation to satisfy <br />within the record <br />Environmental Impact <br />Ordinance. <br />this requirement. <br />Specifically, the Board <br />found that the Phase One <br />Environmental Site <br />Assessment, completed <br />by GEL Engineering of <br />North Carolina, was <br />sufficiently detailed to <br />provide the required <br />information. <br />8.8 d) - A fee, as set by the <br />On August 13, 2008 the <br />The Administration <br />makes a <br />Orange County Board of <br />Planning Board voted <br />unanimously to make an <br />recommendation for <br />Commissioners. <br />affirmative Indicating <br />an affirmative <br />X Yes <br />No that the Applicant had X Yes <br />No finding based on <br />information contained <br />submitted the necessary <br />within the record <br />review fee <br />