Browse
Search
Agenda - 10-07-2008 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-07-2008
>
Agenda - 10-07-2008 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:36:49 AM
Creation date
10/7/2008 11:58:26 AM
Metadata
Fields
Template:
BOCC
Date
10/7/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20081007
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN SOLUTION SIX: <br />The Planning Board <br />The Administration <br />makes a <br />voted Eight (8) to One (1) <br />As outlined on page thirty <br />to make an affirmative <br />recommendation for <br />(30) of the application <br />finding and recommend <br />an affirmative <br />reading as follows: <br />approval of the proposed <br />finding on the <br />`The applicant requests a X Yes <br />No Design Solution with the X Yes <br />No Design Solution <br />allowing for the <br />waiver from Section 3.1 <br />following conditions: <br />modification in only in <br />Architectural Design — <br />1.The light reflecting <br />cases where it can be <br />Corrugated Metal; Highly <br />from roofing materials <br />demonstrated on a <br />Reflective Surfaces; and <br />and will not create a <br />site-specific <br />Illuminated Roofing of the <br />public safety, traffic <br />development plan <br />EDD Design Manual' <br />hazard, or annoyance <br />that the: <br />The applicant is requesting <br />to others, <br />1. The light <br />the ability to have flexibility <br />2.All roof materials shall <br />reflecting from <br />in using highly reflective <br />have SRI for roof <br />roofing materials <br />roof materials when they <br />pitches less than 2:12 <br />and will not <br />are designed to achieve the <br />of 78 and an SRI of 29 <br />create a public <br />various energy objectives <br />for roofs with a pitch <br />safety, traffic <br />outlined within the <br />greater than 2:12 <br />hazard, or <br />to <br />application. <br />(Reference to LEED <br />annoyance <br />others, and <br />Standards) <br />2. All roof materials <br />shall have SRI <br />for roof pitches <br />less than 2:12 of <br />78 and an SRI of <br />29 for roofs with <br />a pitch greater <br />than 2:12 <br />(Reference to <br />LEED <br />Standards) <br />The Planning Board <br />The Administration <br />DESIGN SOLUTION <br />voted unanimously to <br />makes a <br />SEVEN: <br />make an affirmative <br />recommendation for <br />As outlined on page thirty <br />finding and recommend <br />approval of the proposed <br />an affirmative <br />finding on the <br />.(30) through thirty-one (31) X Yes <br />the application reading <br />No Design Solution with the Yes <br />No Design Solution <br />for the <br />of <br />following conditions <br />allowing <br />as follows: <br />modification in only in <br />'The applicant requests a <br />I.The light reflecting <br />cases where it can be <br />waiver from Section 3.1 <br />from solar energy <br />demonstrated on a <br />Architectural Design — <br />collection features will <br />site-specific <br />Corrugated Metal; Highly <br />not create a public <br />development plan <br />Reflective Surfaces; and <br />safety hazard, and <br />that the: <br />Illuminated Roofing of the <br />2.Any buildings utilizing <br />EDD Design Manual' <br />solar panels shall have <br />1. The light reflecting <br />The EDD Design Manual <br />its longer building axis <br />from solar energy <br />collection. features <br />requires that solar panels <br />is at least one and a <br />half (11/2) times the <br />will not create a <br />must be flush with the slope <br />shorter axis and the <br />public safety <br />of the roof. The applicant <br />longer axis is within <br />hazard, and <br />indicates that there may be <br />situations where solar <br />fifteen degrees (150) of <br />2. Any buildings <br />panels cannot be flush with <br />the geographic <br />utilizing solar <br />the roof and that flexibility is <br />east/west axis (LEED <br />panels shall have <br />needed to allow for their <br />Standard) <br />its longer building <br />axis is at least one <br />use <br />
The URL can be used to link to this page
Your browser does not support the video tag.