Orange County NC Website
pRq~' SCHOOL IMPACT FEES: Cw,r'et Hiu-Cait~sORO Cmr SCHOOLS <br />Orange County, North Carolina <br />Figure 7. Chapel Hill-Carrboro City High Schools <br />HIGH SCHOOLS Official <br />brventory, Emoliment, and Utilization Site Building Portables SY 06-07 Level of <br />Facility Acreage Square Feel Classrooms Enrollmenl(1] Capacity Service <br />Carrboro High [2] 62.3 148,073 0 na SOD na <br />Chapel Hill High [3] 85.3 259,869 17 1,778 1,520 117% <br />East Chapel Hill High 74.8 258,985 8 1,742 1,515 115% <br />TOTALS 222.4 666,877 25 3,520 3,835 92% <br />Demand <br />Units Site Building Portables <br />Hioh School Levels of Service (Students) AcrenAe Square Feet Classrooms <br />LOS based on Current Enrollment 3,520 0.063 189 0.0071 <br />LOS based on Capacity <br />`LOS based onABopted LOSStandar'd;(11D°lo) 3,835 <br />4,219 0.056 <br />; D:052 173 <br />158 0.0065 <br />OOD59 <br />Notes to Tables <br />(1] Does not Include CHCCS students attending the Hospital School. <br />(2] Carrboro HS opening far 2007-08; capacity is included in level of service calculation <br />(311ncludes the Phoenix Academy <br />Source: Orange County; CHCCS <br />SCHOOL CONSTRUCTION COSTS <br />TischlerBise analyzed costs for school construction in the Chapel Fill-Carrboro City School <br />System. Costs for completed and planned school projects in CHCCS were provided by the <br />Orange County Budget Office and CHCCS. TischlerBise adjusted previous costs to current <br />(200 dollars, where appropriate, using Marshall Valuation Service Comparative Cost <br />Multipliers.6 Planned project costs are shown in current dollars. Current school costs represent <br />the average costs to construct elementary, middle, and high schools in the CHCCS System. As <br />shown in Figure 8, construction costs average between $221 and $225 per square foot. <br />Specifically, the costs are as follows-Elementary: $221.44 per square foot; Middle: $224.99 per <br />square foot; and High: $223.62 per square foot. <br />s Marshall Valuation Service (Mazshall & Swift/Boeckh, LLC) Comparative Cost Multipliers aze used to convert <br />historical costs to present-day costs. The published indexes and multipliers aze specifically for construction costs <br />taking into account costs of building materials and labor. Multipliers used for CHCCS aze for Raleigh, NC and for <br />Class C properties (buildings with masonry or concrete exterior walls and wood or steel roof and floor structures, <br />except for concrete slab on grade). <br />rISCh~el"~I~' 15 <br />tise~,CC6~°nic5i.C1inn0i~Cen:°9anls. <br />