Orange County NC Website
g <br />§ 5.4.16 Peeparing a set of reproducrble record drawings showLag sfg»~ficant changes in the Work made during <br />construction based on marked up prints, drawings and other data fitraished by the Contracmr to the Architect. <br />§ 3A17 Providing assistance in the utllizatian of equipment or systems such as testing, adjusting and balandng, <br />pmparation of operation and mairtteaauce manualB, training petBOnnel for operatlon and tnainteaance, sad <br />consultation daring operation <br />§ 3.4,18 Providing services af#er issuance to the Owner of the final Certifircate for Paymenk ar In the absence of a final <br />Certificate for Payment, more than 60 days after the date of Substantial Completion of the Work. <br />§ 3.4.19 Providing services of twnsaltsnts far other than arehiteataral, strvctmal, mechatical and eletxrFcal <br />engineering pordons of the Projectpmvided as apart of Basic 5ervicea. <br />§ 3.4.20 Prm~iding any other servicxs not otherwise irtclndad in this Agreement or not customarily farniahed in <br />accordance with generally accepted ardripectaral practkxi. <br />AR7ICL,E 4 OWNER'S RESPONS831l.tilES <br />§ 4.1 The Owner shall pmvide fall informatinn in a timely manner regarding requirements for and limitations on the <br />Project, including a writtep program which shall set forth the Owner's objectives, schedule, constraints and criteria, <br />including specs requirements and relationships, flexibility, expandability, special equipment, sysbetns and site <br />requirements. The Owner shall finnish to the Architect, within 15 days after receipt of a written rtgaest, information <br />accessary and relevant for the Architect to evaluate, give notice of or enforce lieu rights. <br />§ 4.2 The Owner shall establish and periodically update an overall budget for the Project, iaolnding the Conatroction <br />Cost, the Owner's other cysts and reasonable contingencies relemed >b all of these costs. <br />§ 4.5 The Owner ehail designate a representative authorized to act on the Ownar's behalf with respect to the Project. <br />The Owner or such designated representative shall render decisions in a timely tuaonar pertai»ing bo documents <br />submitted by the Arehitect in order to avoid nnreaaonable delay in the orderly end segnenHal progress of the <br />Architect's services. . <br />§ 4.4 The Owner shall famish surveys to describe physical characteristics, le$allimitations and utility locations for the <br />site of the Project, and a written legal description of the site. Tbc surveys and legal infonnadcm shall include, as <br />applicable, grades and lines of streets. alleys, Pavements and adjoining property and structures; adjacent drainage; <br />rights-of-way, restrictions, easements, anoroachmants, zoning, deed restricdona, boundaries and canootus of tho site; <br />locations, dimensions and necessary data with respect to existing buildings, other improvements and trees; and . <br />information concerning available ute~iiy services and lines, both public and private, above and below grade, including <br />inverts and depths. All We information on the survey shall be referenced to a Project benchmark. . <br />• § 4.5 The Owner shall famish the eesvices of geotechnical engineers when each services are requested by the •- <br />Architect. Such servicd may inelnde but are not limited to test borings, test pits, detarminadons of soil bearing values, <br />percolation tests, evahradons of hazardous materials, ground caavsion tests and resistivity tests, including necessary <br />operations for anticipating subsoil conditions, with t~eports and appropriate Peaotntnendations. <br />§ 4.8 The Owner shall furnish ffie services of consulgota other than those designated in Section 4S when such <br />services ace requested by the Architect and ate reasonably required by the scope of the Project <br />§ 4.7 The Owner shalt furnish atmetural, mechanical, sad chemical tests; tests for air and water polhrtion; tests far <br />hazardous materials; sad other laboratory and environmental tests, inspections end reports required bylaw or the <br />Contracx Documears. • <br />§ 4.8 The Owner shall famish all legal, accounting attd instaance services that may be necessary at any time far the <br />• Project to meet the Owner's needs and iniereats. Such services shall include auditing services the Owner may require <br />to verify the Contractor's .Applications far Fayment or to ascertain how or fair what purposes the Contractor has need <br />the money paid by or on behalf of the Owner. <br />A{A Document B1li17Y -1997. Copyrisallt i 1874,1978, 1987 end 7887 6y The AnwdOan N»tituta of Arohkeols. All riphls resertred. WARNING: Tids AIA° <br />tali nocumenl is proteald:t by U.3. Copyright LaN and Internetlona{ Trealles. thrAalhoHyad raproduenon or dlstrwutlon of Ihla AIA° Document, or any <br />portion at Il, may resWl In aew3ra dvil and crUnlnal penalties, and will 6e prosecuted to the maxlm:im exianl possible raider the law. Thb dooumanl was <br />roduoed by AN sofirrara at 12:19:11 an 09/'IBV2008 under ceder No.i00035B709 t which expires on 8/812009, and is not la resat. <br />User Notes: (1205g1401a) <br />