Browse
Search
Agenda - 10-07-2008 - 4i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-07-2008
>
Agenda - 10-07-2008 - 4i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2008 10:13:53 AM
Creation date
10/7/2008 10:13:51 AM
Metadata
Fields
Template:
BOCC
Date
10/7/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4i
Document Relationships
2008-097 Purchasing - Ware Bonsall Architects Inc Jail Expansion and Renovation
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081007
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />ARTICLE 1 ARCHITECTS RESPONSII3A.ITIES <br />§ 1.1 The services performed by the Architect, Architects ernpiayees and Architect's eonsnltants shall be as <br />enumerated in Articles 2, 3 and 12. <br />§ 11 The Architect's services shall be performed as expedidousiy as is consistent with professional skill and cane and <br />the orde+cly progress of the Project. The Architect shaIl submit for the Owner's approval a schedule for the <br />pedormance of the Architect's services which maybe adjusted as tfle Project proceeds. This sehednle shall include <br />aIlowances for periods of time nequirod for the Owner's review a>rd for approval of submissions by authorities having <br />jurisdiction over the Project Time limids established by this schedule approved by the Owner shall not, except for <br />reasotmble cease, be exceeded by the Architect or Owner. <br />§ 1.3 The Architect shell designate a represenfativc authorized m act on behalf of lire Architect with respect to the <br />Project <br />§ 1 A The services covered by this Agreement are subject to the time limitatioae contained is Section 11,5.1. <br />ARTICLE 2 SCOPE OF ARCHITECT'S BASIC SERVICES <br />§ 2,1 DEFWITION <br />The Architrrct's Basic Services consist of those descxfbed in Sections 2.2 through 2.ti and any other srxvioes identiIIed <br />in Article 12 as part of Basic Services, and include Thermal structural, mechanical and electrical engineering services. <br />§ 2.23CHEAlATIC DESIGN PHASE <br />§ 2.2.1 The Architect shall review the program furnished by the Owner m ascertain the requirements of the Project and <br />shall strive at a mutual understanding of such requirements with the Owner. <br />§ 2.2.2 Tha Architect shall provide a preliminary evaluation of the Owner's program, schedule and constractitsn <br />budget require-,~RYR~ each in teens of the other, subject to the limitations setfasth 3n Seedon 5.2.1. <br />§ 2.2.3 The Architect shall review with the Owner alte;'native approaches to design and construction of the Project. <br />§ Z.2.4 Based err the mutually agreed-upon program, schedule and construction bodgetregaistmcnts, the Architect <br />shall prepare, far approval by the Owner, Schematic Design Docm[ents consisting of drawings and othcx documents <br />illustrating the scale and relationship of Project oompoaents. - <br />§ 2.2.5 The Architect shall subaat to the Owner a preliminary estimate of Construcxion Cost based on current area, <br />volume or similar conc:eptuai estimating techniques. <br />§ 2.3 DESIGN DEVEI.OPMENi PHASE <br />§ 2.3.i Based on the approved Schematic Design Documents and any adjustments authorized by the Owner is the <br />program, schedule or construction budget, the Architect shall prepare, for approval by the Owner, Design <br />Development Documents consisting of drawings and other doenments to IIx and describe the size and character of the <br />Project as to architectural, atrncttnal, mechanical sad electrical systems, materials and such other elements as maybe <br />appropriate. <br />§ 2.5.2 The Architect sbaIl advise the Owner of any adjustments to the prellzohrary estimate of Constructon Cost. <br />§ 2.4CONSTRUCTIDN DOCUMENT8 PHASE <br />§ 2:41 Based on the approved Design Devdopmcnt Documents and any fntiher adjustments in the scope or quality of " <br />the Project or in the construction budget authorized by the Owner, the Architect shall prepare, far approval by the <br />Owner, Construction Documents oonsiating of Drawings and Specifications setting forth in detaII the requirements far <br />the construction of the Project <br />§ 2.42 The Architect shari assist the Owner in the preparation of the necessary bidding information, bidding forms, the <br />Conditions of the Contract,"and the form of Agteemtwt between fhe Owner and Contractor. <br />ktit AIA 1>ocumant 81b7 n -19BX CoPYrb~ • 1874,1879,1887 and 1887 by The Amer[tatri ins8btle at ArcH[ecis. Alt rights rtasarved. WAHHIHO: This AIAs <br />Oooument la proteM,t<t by U.S. Copyr)ghl t.avr and tntarhationrl Trestles. UnaulhorlTSd rsproducaan or Glstraflaton o1 this AIAs nooumsnr, or arty 2 <br />person of Ft, may retell In severs olva snd diminal penalties, er,d will be proseouled 10 the maximum sttishl possible under the law. This document was <br />I U~ Nolte AW sotNmro at [2:18:1 i on 00/19(2009 under thderlda10W8687o9_1 whloh expires on 6!6!2006, and b eerier resat. (1206414043) <br />
The URL can be used to link to this page
Your browser does not support the video tag.