Browse
Search
Agenda - 10-07-2008 - 4i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 10-07-2008
>
Agenda - 10-07-2008 - 4i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2008 10:13:53 AM
Creation date
10/7/2008 10:13:51 AM
Metadata
Fields
Template:
BOCC
Date
10/7/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4i
Document Relationships
2008-097 Purchasing - Ware Bonsall Architects Inc Jail Expansion and Renovation
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081007
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~ <br />ARTICLE 11 BASIS OF GOMPENSATiON <br />The Owner shall ~mpensate the Architect as follows: <br />§ 11.1 An Initial Payment of Zero Dollars and Zem Ceuta {$ 0.00) shall be made upon execution of this Agreement <br />and credited to tltk Owner's account at final payment. • <br />§ 11.2 BASIC COIVIPENSATION <br />§ 11.2.1 For Basic Services, as described in Article 2, and any other services included in Article 12 as part of Baaio <br />Sen+itxs, Basic Can~sation shall be comlxitad as foIlows: <br />{Insert basis of compensation, including stipulated sums, multiples or percentages and ident~y phases to which <br />particular methods of comptnsation apply, ~f necessary.) <br />Phase I -Feasibility Study - Bxhibit A -stipulated sum of Twenty Tfloueand and OOJ100 Dollars ($20,000:00), <br />including expenses. • <br />Phase II -Design through Consteudioa -fee to be determined based on ten percent (1096) of the construction cost. <br />§ 11.2.2 Where compensation is based on a stipulated sum or percentage of Construction Goat, progress payments for <br />Basic Services in each phase shall total the following percentages of the total Basic Compensation payable; <br />{Xnsert additional phases as approprFate.) <br />Schematic Design Phase: ' Zero percent ( 0 9b} <br />Design Development Phase: Twenty-five percent ( 2S %) <br />Constmetion Documents Phase: Forty-ffve pert ( 45' 9b} <br />Bidding or Negotiation Phase; Five petcartt ( 5 96) <br />Constntation Phase: Twenty percent ( 20 96) <br />Total Basic Compensation one hundred •percent (. 100.00 %) <br />§ 1i.3 COMPENSJITION FOR ADDITIONAL SFRNIt'UrS ' <br />§ 11.3,1 Far Project }Zeprese~ation Beyond Basic Services, as desan"bed in 3ectioh 3.2, wmpensatlon shaIl be <br />ca~mpuDcd as follovta~ <br />To be determined if requested <br />§ 11.32 For Additional Services of the ArcMtect, as described in Articles 3 and 12, other tltaa (1) Additional Project <br />Representation, as dcscrtbed in Section 3.2, and (2) services included in Article 12 as part of Basic Services, but <br />excluding services of eansulturtts, eampensatton shall be computed as follows: <br />(Insert basis of compe-rsatlon. including rates arul multiples of Direct Personnel Ekpanse for Principals and <br />employees, and identify Principals and classify employees, if requirecL Ident(fy spec~fc services fo which particular <br />methods of compensation apply, ~'neeessary.) <br />I $ased upon the Arcbitect.'s Standard Rate Sheet, attaehcd, or mutnaIly agreed open stipulated sum, <br />§ 11.3,3 For Additional Services of Consultants, ienluding additional structural, mechanical and electrical engineering <br />services and those paovldod under Section 3.4.19 or identified 3n Article 12 as part of Additional Services, a multiple <br />of One and two-tenths (1.20 )times the amounts billed to the Architzd far such services. <br />(Identify specific types of consultants in Article X2, (J'requlred) <br />§ i1A REIMBURSABLE EXPENSES <br />For Reimbursable ]3zpeuaes, as described in Section 10.2, and any other items included in Article 12 as Reimbursable <br />F.xpenges, a mtiltiple of One and two-tenths (1.20 )times the expenses incurred by the Architect, the Architect's <br />employees and consultants diieatly relabel to the Project. <br />init. Atq oocum^rd 8151 ~ -1997. Copyri~rt O 1874, 1879,18e7 end tee? by The Ametloali trend,te ~ ArclAteote- All r-gtds reserved WARNtNti: This AIA" <br />Document is protected by V.3. Copyriphr Low and ieternalonal Treatlos, tJnaatho~txsd raproduotton or dtsMbuOan of this AIAw Document, or any 1$ <br />portion of Il. may result In savors civil end erlmlrral penafllea, and will he prosecuted to the maximum erlenl possible under the Iaw. This dooumanl was <br />~ produOOd by AIA software at 12^19: t i on 09f18/200a under Order No.10009~708_1 which e~lres ai GI612008, and b hot for resets <br />[leer Notes: (12t>rrt1A043) <br />
The URL can be used to link to this page
Your browser does not support the video tag.