Browse
Search
S Grant- Sheriff Amendment to Contract four Use of Durham 2005 COPS Inter.
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
BOCC Grants
>
2000 - 2009
>
2008
>
2008 Grants
>
S Grant- Sheriff Amendment to Contract four Use of Durham 2005 COPS Inter.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2011 3:32:34 PM
Creation date
10/2/2008 3:16:20 PM
Metadata
Fields
Template:
BOCC
Date
6/24/2008
Meeting Type
Regular Meeting
Document Type
Grant
Agenda Item
4r
Document Relationships
Agenda - 06-24-2008-4r
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 06-24-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please return this copy t ~ ^ y ~' <br />-Clerk to the Board's office for PAF <br />SECOND AMENDMENT TO CONTRACT <br />FOR USE OF THE CITY OF DURHAM 2005 COPS INTEROPERABLE <br />COMMUNICATION TECHNOLOGY GRANT BY ORANGE COUNTY <br />This Second Amendment To Contract ("Amendment") is dated and entered into as of the <br />12~' day of May, 2008, between Orange County ("Sub-recipient's and the City of <br />Durham ("City' <br />The City and the Sub-recipient entered into a contract titled "Contract for Use of the City <br />of Durham 2005 COPS Interoperable Communications Technology Grant by Orange <br />County," dated April 1, 2006 (referred to herein as the "Original Contract'. The <br />Original Contract was first amended on January 15, 2007 (referred to herein as the "First <br />Amendment to Original Contract'. The First Amendment to Original Contract is hereby <br />further amended as follows: <br />1. The dates in Attachment A, Section 1, Scope of work in this COPS <br />Interoperabilityprnject aze changed from: <br />1. Award of grant anticipated September, 2005 <br />2. Procurement and purchasing process begins October 1, 2005 <br />3. Equipment delivered by July 1, 2007 <br />4. Installation of equipment completed by September 1, 2007 <br />5. Training users on use of equipment begins September 5, 2007 <br />6. User training completed by October 5, 2007 <br />7. Review and evaluation of project conducted in January 31, 2008 <br />8. Project completed and reported by end' of February 15, 2008 <br />to read as amended hereby: <br />1. Award of grant anticipated September, 2005 <br />2. Procurement and purchasing process begins October 1, 2005 <br />3. Equipment delivered by July 1, 2007 <br />4. Installation of equipment completed by May 30, 2008 <br />5. Training users on use of equipment begins June 5, 2008 <br />6. User training completed by July 5, 2008 <br />7. Review and evaluation of project conducted in August 31, 2008 <br />8. Project completed and reported by end of September 15, 2008 <br />2. Attachment A, Section 3, will be changed from: <br />2 20 KVA Uninterrnptable Power Supplies (UPS) <br />Two 20 KVA Uninterruptable Power Supplies (UPS) will be purchased to <br />provide backup power for interoperable communications equipment to <br />provide surge protection for critical equipment, reduce brownout effects and <br />provide a temporary source of backup power until the facility•generator <br />activates. This equipment will also provide a tertiary power source in the <br />event the facility emergency generator fails to activate, thus allowing staff <br />the time to affect repairs on the backup generator as necessary without <br />compromising emergency services. 20 KVA Unintemiptable Power Supplies <br />(LIPS) cost approximately $24,345 each for a total of $48,690. <br />to read as amended hereby: <br />
The URL can be used to link to this page
Your browser does not support the video tag.