Orange County NC Website
1.999-2005 TIP <br />HIGHWAY PROGRAM ~" • ~ ORANGE COUNTY <br />LENGTH TOTAL PRIOR YRS. COST . <br />ROUT'E/CITY ID NO. LOCATION AND DESCRIPTK)N (MI) EST. COST COST WORK TYPE FUNDINf3 ESTIMATES SCHEDULE <br />(KM) (THOU.) (THOU.) SOURCE (THOU.) (FISCAL YEARS) <br />1-40 h3308 1.85 IN ORANGE COUNTY TO NC 147 (BUCK DEAN ~ 20.7 71421 800 DESIGN IN PROGRESS <br />FREEWAY) IN DURHAM COUNTY. ADD ADDITIONAL 33;3 CONSTRUCTION NHS 33785 FFY 02 03 04 <br />LANES. ~ ~' CONSTRUCTION NHS 37058 POST YEARS <br />h40 AND h85 M4017 W0, EAST OF h85 TO EAST OF NEW HOPE CHURCH 20.9 2811 DESIGN IN PROGRESS <br />ROAD IN ORANGE COUNTY; h40, EAST OF NC 88 IN 33,E CONSTRUCTKOV IM 2811 FFY 00 <br />ORANGE COUNTY TO WEST OF NC 54 AND SR 1118 TO <br />EAST OF NC 147 IN DURHAM COUNTY; I-85, I-40 TO THE <br />DURHAM COUNTY LINE. INSTALL MEDIAN GUARDRAIL. <br />h85 1.305 • h40 AT HILLSBOROUGH TO DURHAM COUNTY UNE. ' 7.5 43306 1800 RIGHT-0F-WAY NHS 1579. POST YEARS <br />WIDEN FREEWAY TO SIX LANES AND RECONSTRUCT 14,1 CONSTRUCTION NH3 39927 POST YEARS. <br />INTERCHANGES AND STRUCTURES. UNFUNDED PROJECT <br />I-85 44035 Id0 TO THE DURHAM COUNTY LINE. RESURFACE 8.9 2852 DESIGN . IN PROGRESS <br /> 14.3 CONSTRUCTION IM 2852 FFY 00 <br />US 15-501 R-942 PROPOSED PITTSBORO BYPASS (R 2219) TO CHAPEL 12.8 71943 18143. DESIGN IN PROGRESS <br /> HILL BYPASS. WIDEN ROADWAY TO A MULT4LANE 20,g RIGHT-0F-WAY IN ACQUISITION <br /> FACILITY. CONSTRUCTION STP 53800 FFY 00 01 02 03 04 05 <br /> . PART UNDER CONSTRUCTION <br />NEW ROUTE R-2630 • DURHAM NORTHWEST LOOP (ENO DRIVE), h85 (WEST) <br />TO I-85 (NORTH). MULTI-L,ANE FACILITY. PART ON 9.7 <br />15.6 118265 859 RIGHT-0F-WAY <br />CONSTRUCTION T <br />T 37883 <br />79723 POST YEARS <br />POST YEARS <br /> NEW LOCATION. UNFUNDED PROJECT <br />US 15501 U-4008 US 15-501MC 751(ERWIN ROAD). INTERSECTION 675 PLANNING FY 00 • <br /> IMPROVEMENT. DESIGN :.: FY 01 <br /> RIGHT-OF-WAY STP 225 FFY 02 <br /> • CONSTRUCTION ' STP 450 FFY 02 <br />VARIOUS U-9999 DA FUNDS. 17356 .5345 CONSTRUCTKN STP 12011 FFY 00 01 02 03 <br />CARRBORO U-2803 SR 1919 (SMITH LEVEL ROAD), ROCK HAVEN ROAD TO 0.8 2686 200 •PLANNING tN PROGRESS <br /> BRIDGE N0.88. WIDEN. ROADWAY TO A MULTh LANE 1,0 DESIGN FY 00 <br /> FACILITY. RIGHT-OF WAY S 675 SFY 02 <br /> CONSTRUCTKN S 1791 3FYt04 <br />CARRBORO U-3100 3R 1009 (HILLSBOROUGH ROAD), LORRAINE STREET 1.9 5812 940 DESIGN JN PROGRESS <br /> • TO SR 1107 (OLD FAYETTEVILLE ROAD) ANO ALONG 3.1 CONSTRUCTION S 2459 SFY 01 <br /> SR 1107 TO NC 54. WIDEN ROADWAY TO A THIRTY- RIGHT-0F-WAY S 391 POST YEARS <br /> SIX FOOT CURB AND GUTTER FACILITY. CONSTRUCTION S 2022 POST YEARS <br />CHAPEL HILL U-824 NC 88 (SOUTH COLUMBIA STREET), SR 1906 0.5 .3536 -305 PLANNING )N PROGRESS <br /> (PUREFOY ROAD) TO SR 1904 (MASON FARM ROAD). p,g DESIGN FY 01 <br /> WIDEN TO INCLUDE BICYCLE LANES. RIGHT-0F-WAY STP 1739 FFY 03 <br /> ' ~ CONSTRUCTION STP 1493 FFY 04 <br /> <br />* INDICATES INTRASTATE PROJECT 7-17 ALL SCHEDULES SUBJECT TO AVAILABILITY OF FUNDS <br />•A <br /> <br />