Browse
Search
Agenda - 11-22-1999 - 7
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 11-22-1999
>
Agenda - 11-22-1999 - 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 11:25:28 AM
Creation date
9/23/2008 11:24:25 AM
Metadata
Fields
Template:
BOCC
Date
11/22/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
7
Document Relationships
Minutes - 19991122
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br />F9 <br />DURHAM <br />CHAPEL HILL CARRBORO <br />METROPOLITAN PLANNING ORGANIZATION <br />TRANSPORTATION IMPROVEMENT PROGRAM PROJECT REQUEST <br />Proiect Title. US 70 Bypass Widening <br />Estimated Cost: Unknown <br />Requesting Agency Orange County <br />Proiect Description• Widen US 70 Bypass from the intersection of US 70 <br />Business to the US 70 -185 Connector to a four -lane <br />divided section with bicycle and pedestrian facilities. ' <br />Proiect Justification US 70 Bypass is a major thoroughfare projected to be <br />over capacity during the design period _(2020). The <br />intersection of US 70 Bypass at NC 86 is listed as a high <br />accident location (Hillsborough Transportation Plan) <br />having an average of 32 accidents per year for the period <br />from 4192 to 4/95 the highest accident intersection <br />within the highest accident frequency within the <br />Hillsborough planning area. Cost/benefit ratio for <br />widening US 70 is +1.1, and based on its benefits, the <br />project is rated second in priority of projects <br />recommended in the 1997 Hillsborough Transportation <br />Plan. <br />Proiect Evaluation Criteria <br />9. An element of the "2025 Current Trend Long Range Transportation Plan" No <br />2. Degree of congestion (volume%apacity) 2020 projection: 12,800 - 18,900 vpd ' <br />3. Safety (e.g., accidents/1.00 million vehicle miles of travel)- >32 1yr @ US 70 <br />Bypass and NC86 (1992 1995) <br />5. Promotes National Highway System No <br />6. Reduces use of single occupant vehicle No <br />7. Provides for more transportation choices Yes <br />8. Promotes energy conservation Yes <br />9. Has minimal impact on the natural environment No <br />10. Encourages economic development consistent with adopted land use plans No <br />99. Adverse impacts do not disproportionately affect low income populations No <br />
The URL can be used to link to this page
Your browser does not support the video tag.