Browse
Search
Agenda - 11-22-1999 - 7
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 11-22-1999
>
Agenda - 11-22-1999 - 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 11:25:28 AM
Creation date
9/23/2008 11:24:25 AM
Metadata
Fields
Template:
BOCC
Date
11/22/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
7
Document Relationships
Minutes - 19991122
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT I <br />M <br />> 2025 Current Trend Plan or a project being considered in Tier .1 I Analysis <br />.. for 2025 Transportation Plan <br />➢ Degree of congestion); <br />➢ Safety - issues; <br />• ➢ Promotes National Highway System; <br />➢ Reduces use of single occupancy vehicles; <br />➢ Provides for more transportation choices; <br />➢ Promotes energy conservation; <br />➢ Has minimal impact on the natural environment; <br />➢. Encourages economic development; <br />➢ Adverse impacts do not disproportionately affect low income populations; <br />➢ Transportation Improvement Program Status; <br />➢ Type of transit project (transit projects only). <br />A subcommittee of the TCC met Friday, November 12 to develop a <br />recommendation based on a technical analysis of each project. On November <br />17, 1999, the TCC voted to forward the draft priority list to the Technical Advisory <br />Committee with the recommendation that the TAC open a public comment period <br />on the draft list. The TAC will receive the TCC recommendation (Attachment 6) <br />at its December 8, 1999, meeting. <br />The TAC will recommend a Regional Priority List to be available for public <br />comment for a four-week period. After the public comment period, the TAC will <br />approve a Regional Priority List to be forwarded to NCDOT for consideration in <br />the development of the DCHC 2002 — 2008 IVITIP. <br />IVITIP Development Process <br />Attachment 7 is the FY 2002 — 2008 IVITIP Development Schedule <br />g:\k1inco1nXtip02-08Xtip1istX1 1-9-99X1 1-17-99*1 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.