Browse
Search
Agenda - 09-22-2008 - 5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-22-2008
>
Agenda - 09-22-2008 - 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:35:11 AM
Creation date
9/19/2008 4:09:21 PM
Metadata
Fields
Template:
BOCC
Date
9/22/2008
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
5
Document Relationships
Minutes - 20080922
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 - introduction <br />2035 LRTP and CTP <br />Alternatives — Introduction <br />What is the 2035 LRTP? <br />The 2035 Long -Range Transportation Plan (LRTP) is the guide for major transportation <br />investments in the Durham - Chapel Hill- Carrboro Metropolitan Planning Organization <br />(DCHC -MPO) area. The DCHC -MPO area covers the entire Durham County and the <br />urbanized portions of Orange and Chatham Counties. The 2035 LRTP recommends <br />major transportation projects, policies and strategies designed to maintain existing <br />transportation systems and serve the region's future travel needs. The 2035 LRTP is also <br />designed to support land use and air quality goals for the urban area, and must be <br />prepared in accordance with Federal transportation and environmental requirements.. <br />Projects must be in the 2035 LRTP in order to receive state and federal transportation <br />funding through the North Carolina Transportation Improvement Program (TIP). <br />What is the CTP? <br />North Carolina General Statute 136 -66.2 requires each municipality or Metropolitan <br />Planning Organization (MPO), with the cooperation of the NCDOT, to develop a <br />Comprehensive Transportation Plan (CTP) serving present and anticipated travel demand <br />in and around the MPO. The CTP is a series of 5 sheets that include: Adoption Sheet, <br />Highway Map, Public Transportation and Rail Map, Bicycle Map, and Pedestrian Map. <br />These sheets show current and future transportation facilities. The principal differences <br />between the -LRTP and CTP include: <br />• LRTP lists only proposed highway improvements and transit services, whereas <br />the CTP maps out both the current and proposed projects; <br />• LRTP must be fiscally- constrained, i.e., the anticipated revenues must cover the <br />anticipated costs, but the CTP has no fiscal element. <br />The development process for these two documents, which includes the use of a travel <br />demand model and extensive public involvement, are very similar. As a result, the <br />DCHC MPO will complete the development process for both documents at the same <br />time. <br />What are Alternatives? <br />The DCHC MPO plans to develop and evaluate several Alternatives in the process to <br />create the 2035 Long Range Transportation Plan. Each Alternative will be a combination <br />of a Transportation System, which includes a set of highway, transit and other <br />transportation improvements, and a Land Use Scenario that distributes the forecasted <br />1 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.