Browse
Search
Agenda - 12-13-1999 - 4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 12-13-1999
>
Agenda - 12-13-1999 - 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 2:35:02 PM
Creation date
9/18/2008 12:09:17 PM
Metadata
Fields
Template:
BOCC
Date
12/13/1999
Meeting Type
Schools
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes - 19991213
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®range Countp JRoarb of 41butation A&cbnr , 4d <br />RANDY BRIDGES SUPERINTENDENT <br />ftlzborouab, PC 27278 <br />BOARD MEMBERS 200 EAST KING STREET <br />SUSAN DOVENBARGER, CHAIR HILLSBOROUGH, NC 27279 <br />KEITH COOK, VICE CHAIR TELEPHONE 919 - 7324129 <br />ROBERT H. BATEMAN - FAX: 919 - 732 -8120 <br />RICHARD KENNEDY <br />DAVID KOLBINSKY <br />DELORES SIMPSON <br />BRENDA STEPHENS <br />MEMORANDUM <br />TO: Rod Visser <br />FROM: Randy Bridges <br />RE: Information requested from the 8/24/99 meeting <br />DATE: September 7-, 1999 <br />Please find below the information we discussed last week during our monthly meeting. If you need <br />additional information please let me know. <br />1. Identify all CIP Projects including supporting information. <br />• As you are aware we have obligated the majority of our CIP to the construction of the new high <br />school. We do have some other projects outside the high school construction, and I have enclosed <br />a copy of the projects and their completion dates. Again, there are no new projects, and the work <br />is ongoing. <br />2. Status on new elementary and high school. <br />• New Elementary School — This school is scheduled to open August 2000. The site has been <br />cleared and the building pad could go down in a few weeks. You have a cash flow sheet on this <br />project, and there have been no major changes. I have enclosed the sheet on the high school and . <br />the elementary school for your information. <br />• New High School — We have closed on the land purchase, approximately 66 acres across the street <br />from Grady Brown Elementary. Our plan is to open this school August 2002. We will begin <br />clearing the site by selling the timber over the next few months. There have been some <br />preliminary meetings with internal groups about the design and program requirements. This <br />school will be constructed to accommodate 1000 students. <br />3. The construction cost for A. L. Stanback is included on a separate spreadsheet <br />4. The construction cost of New Hope Elementary is listed below; however, we are unable to <br />itemize information about the construction cost: <br />• Bond $5,991,000.00 <br />• IBM $1,000,000.00 <br />• Triangle J. Council $ 250,000.00 <br />• Public School Building Fund $2,220,351.00 <br />• Pay As You Go Funds $ 642.158.00 <br />Total $10,103,509.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.