Browse
Search
Agenda - 12-13-1999 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 12-13-1999
>
Agenda - 12-13-1999 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 2:32:44 PM
Creation date
9/18/2008 11:47:41 AM
Metadata
Fields
Template:
BOCC
Date
12/13/1999
Meeting Type
Schools
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 19991213
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL - CARRBORO CITY SCHOOLS <br />GLENWOOD RENOVATION PROJECT <br />PROJECT TOTAL 1,500,000 <br />Activity <br />Description <br />Estimate <br />1 <br />HVAC <br />30 unit ventilators at $9,000 per <br />270,000 <br />unit plus required patching, <br />connecting, required material <br />10,000 <br />2 <br />Toilet Rooms <br />1,000 sf of bathroom area <br />150,000 <br />in old section of school, <br />work to include new fixtures, <br />partitions, tile, lights, ceilings <br />at $150 per sf <br />3 <br />Classrooms <br />upgrade remaining classrooms <br />350,000 <br />to inc.:lighting, ceiling, electrical, <br />millwork, and flooring <br />Approximately, 11,640 sf of <br />classroom space at $30 per sf <br />4 <br />Cafeteria <br />2,000 square feet of space <br />150,000 <br />(seating area only) <br />lighting, ceiling, flooring, <br />HVAC, electrical, data <br />at $75 per sf <br />6 <br />Windows <br />replacement cost based on recent <br />200,000 <br />window system installation at <br />Estes Hills Elementary <br />7 <br />Structural <br />repair /replace mortar, <br />150,000 <br />subgrade compactions, <br />pointing, expansion joints, <br />foundation drain, <br />8 <br />Fire Alarm <br />replace existing system with new <br />50,000 <br />System <br />installation meeting current code <br />requirements <br />9 <br />Misc. <br />electric, painting, flooring <br />25,000 <br />10 <br />Professional <br />structural and mechanical <br />100,000 <br />Fees <br />engineering, architectural <br />6.6% of project <br />11 <br />Contingency <br />at 3% <br />45,000 <br />PROJECT TOTAL 1,500,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.