Orange County NC Website
CHAPEL HILL - CARRBORO CITY SCHOOLS <br />GLENWOOD RENOVATION PROJECT <br />PROJECT TOTAL 1,500,000 <br />Activity <br />Description <br />Estimate <br />1 <br />HVAC <br />30 unit ventilators at $9,000 per <br />270,000 <br />unit plus required patching, <br />connecting, required material <br />10,000 <br />2 <br />Toilet Rooms <br />1,000 sf of bathroom area <br />150,000 <br />in old section of school, <br />work to include new fixtures, <br />partitions, tile, lights, ceilings <br />at $150 per sf <br />3 <br />Classrooms <br />upgrade remaining classrooms <br />350,000 <br />to inc.:lighting, ceiling, electrical, <br />millwork, and flooring <br />Approximately, 11,640 sf of <br />classroom space at $30 per sf <br />4 <br />Cafeteria <br />2,000 square feet of space <br />150,000 <br />(seating area only) <br />lighting, ceiling, flooring, <br />HVAC, electrical, data <br />at $75 per sf <br />6 <br />Windows <br />replacement cost based on recent <br />200,000 <br />window system installation at <br />Estes Hills Elementary <br />7 <br />Structural <br />repair /replace mortar, <br />150,000 <br />subgrade compactions, <br />pointing, expansion joints, <br />foundation drain, <br />8 <br />Fire Alarm <br />replace existing system with new <br />50,000 <br />System <br />installation meeting current code <br />requirements <br />9 <br />Misc. <br />electric, painting, flooring <br />25,000 <br />10 <br />Professional <br />structural and mechanical <br />100,000 <br />Fees <br />engineering, architectural <br />6.6% of project <br />11 <br />Contingency <br />at 3% <br />45,000 <br />PROJECT TOTAL 1,500,000 <br />