Browse
Search
Agenda - 12-13-1999 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 12-13-1999
>
Agenda - 12-13-1999 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 2:32:44 PM
Creation date
9/18/2008 11:47:41 AM
Metadata
Fields
Template:
BOCC
Date
12/13/1999
Meeting Type
Schools
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 19991213
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM (5a) , <br />Assumptions/Disclaimers: <br />L Present school capacities were assumed fixed at the following rates: <br />A. Elementary 600 students <br />B. Middle 900 students OR 700 students <br />C. High 1200 students <br />2. Future school construction and capacities were assumed at the following rates <br />A. Elementary 600 students <br />B. Middle 900 students OR 700 students <br />C. High 1200 students <br />3. Over capacity was gauged at the total capacity of each school level: <br />A. Elementary (E) 108.3% 600 to 650 students <br />B. Middle (Ivn 108.3% 900 to 975 students <br />(700 to 758 students) <br />C. High 108.3% 1200 to 1300 students <br />4. Flex space required at maximum over capacity of each school level: <br />A. Elementary Two 25 student classes <br />B. Middle Three 25 student classes <br />(Two 29 student classes ?) <br />C. High Four 25 student classes <br />5. New students were added at a constant rate to the year 2030: <br />A. 300 students per year in CHCSD <br />B. 150 students per year in OCSD <br />6. New students were distributed to different school levels at constant rates: <br />A. Elementary 490/6 of total new students <br />B. Middle 24% of total new students <br />C. High 27% of total new students <br />New students were distributed equally among all of the elementary, middle and high schools. <br />7. Shaping Orange County's Future projections assume a constant growth rate of 1.45% per year. <br />8. High schools are assumed to serve a capacity of 1200 students. If high schools can expand to eventually <br />serve a capacity of 1500 students, new high schools will be required later than these projections show. <br />
The URL can be used to link to this page
Your browser does not support the video tag.