Orange County NC Website
2 -39 <br />® DCHC WO Boundary <br />2035 Afternoon Peak Hour <br />Moderate <br />Municipal Boundaries <br />iiydrologral Boundaries <br />© County Boundaries <br />Volume over Capacity Ratio (VoQ <br />dal <br />Roadway Volume over Capacity Ratio (VoC) <br />Multimo <br />0.00 <= VOC < 0.80 <br />Alternative 6c <br />M 0.80 <= VOC < 1.00 <br />Transit Nodes <br />Land Use Scenario <br />1.00 <= VOC < 1.10 <br />1.10 <= VOC <br />Afternoon Peak Hour Volume <br />This map rep—ents the ado between <br />w��� and capacity, <br />�® <br />N <br />o•r� projected roadway wl—e <br />assuming amodeammultimodaltransporation <br />DCHC MPO Area <br />10000 5000 2500 <br />�• system for the tansit nodes land use scenario. <br />0 1.5 3 4.5 <br />August 2008 <br />Miles <br />