Browse
Search
Agenda - 09-16-2008 - 6e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-16-2008
>
Agenda - 09-16-2008 - 6e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:31:26 AM
Creation date
9/17/2008 1:19:47 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6e
Document Relationships
Minutes - 20080916
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
RES-2008-066 Alternatives Durham-Chapel Hill-Carrboro Metropolitan Org 2035 Transp Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2 - Aftematives - Model Data - Congestion Maps <br />comparing the E +C Congestion Map with the other Alternatives, you can see how well <br />the transportation investments in that Alternative address the congestion in the E +C. <br />Congestion Maps for Alternatives <br />On the following pages, the Congestion Maps are presented in the order shown on the <br />table below. <br />2 -24 <br />Alternative: <br />ID <br />; Trans portation System <br />: Land Use Scenario <br />N/A <br />; Existing Plus Committed <br />; Baseline <br />2 A <br />;Com rehensive Transportation Plan ;Baseline <br />2 -13 <br />; Comprehensive Transportation Plan ; Buildout <br />3 —A <br />; Intensive ffighway Highway <br />Baseline <br />3-13 <br />: Intensive 11ighway Highway <br />Constrained <br />3 -C <br />Intensive 0g4way Highway <br />Travel Corridor <br />4 -A <br />Intensive Fixed Guideway <br />Baseline <br />4 -13 <br />Intensive Fixed Guideway <br />Travel Corridor <br />4 -C <br />; Intensive Fixed Guideway <br />; Transit Node <br />5 -A <br />; Intensive Bus Transit <br />; Baseline <br />5 -13 <br />; Intensive Bus Transit <br />; Travel Corridor <br />5 -C <br />; Intensive Bus Transit <br />Transit Node <br />6 -A <br />: Moderate Multimodal <br />Baseline <br />6 -13 <br />Moderate Multimodal <br />Travel Corridor <br />6 -C <br />Moderate Multimodal <br />Transit Node <br />2 -24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.