Browse
Search
Agenda - 09-16-2008 - 6e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 09-16-2008
>
Agenda - 09-16-2008 - 6e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:31:26 AM
Creation date
9/17/2008 1:19:47 PM
Metadata
Fields
Template:
BOCC
Date
9/18/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6e
Document Relationships
Minutes - 20080916
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
RES-2008-066 Alternatives Durham-Chapel Hill-Carrboro Metropolitan Org 2035 Transp Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2 - Alternatives - Model Data - Evaluation Measures <br />2035 LRTP and CTP <br />Alternatives — Evaluation Measures <br />Purpose of Evaluation Measures <br />Evaluation Measures are very similar to Performance Measures. Evaluation Measures <br />indicate the general performance of a transportation system and therefore are useful for <br />comparing the efficiency and effectiveness of the different transportation Alternatives. <br />All of the data used for calculating the Evaluation Measures comes from the Triangle <br />Regional Model. The Evaluation Measures provides a more detailed set of statistics than <br />the Performance Measures. <br />The tables in this section are presented in the same order as the Performance Measures in <br />the preceding pages. The only significant difference in the format will be: <br />• The Performance Measures compares the Alternatives' values to a set of Targets, <br />while the Evaluation Measures compares the Alternatives' values to the E +C <br />values. The E +C is composed of a transportation network of the existing and <br />committed highway and transit facilities, and the 2035 socioeconomic data (i.e., <br />population and employment in the year 2035). Thus, the E +C serves as a <br />benchmark for comparing how much the evaluation measures improve with the <br />transportation investments in the different Alternatives. <br />• The Evaluation Measures table has columns are in the right -hand side that <br />calculate the difference between the E +C and Alternatives values. <br />Please note that there are two pages for each Evaluation Measure table. <br />2 -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.