Orange County NC Website
Section 2 - Alternatives - Model Data - Performance Measures <br />1. Alternatives using Baseline SE Data <br />2. Comprehensive Transportation Plan (CTP) Alternatives <br />3. Intensive Highway Alternatives <br />4. Intensive Fixed Guideway Alternatives <br />5. Intensive Bus Transit <br />6. Moderate Multimodal Alternatives <br />Use of E +C <br />The column in the table designated as E+C indicates Existing plus Committed. The E +C <br />is composed of a transportation network of the existing and committed highway and <br />transit facilities, and the 2035 socioeconomic data (i.e., population and employment in <br />the year 2035). Thus, the E +C serves as a benchmark for comparing how much the <br />performance measures improve with the transportation investments in the different <br />Alternatives. <br />Tarizets <br />The DCHC MPO set Targets — Good, Better and Best — for each Performance Measure. <br />The Target values are shown in the right side columns and serve as another benchmark <br />for comparing the different Alternatives. <br />i <br />