Orange County NC Website
Section 5 - Land Use Scenarios <br />• Recommended Policies — There is a discussion of the objectives of each scenario and a <br />list of sample policy directions to realize the scenarios. Begins on pace 21. <br />Additional. Information <br />There are a few additional points that are important to understanding the use of these <br />scenarios: <br />CAMPO Participation — The Capital Area Metropolitan Planning Organization <br />(CAMPO) has developed SE Data for a set of land use scenarios that complement the <br />four DCHC MPO land use scenarios. The SE Data for these scenarios has been <br />combined and checked by the Triangle Regional Model Service Bureau. <br />Scenario Implementation -- The TAC might be able to adopt the SE Data produced by <br />a favorable land use scenario. The 2035 LRTP and Air Quality Conformity <br />Determination would also be based on this newly adopted SE Data. <br />Scenario Review <br />This section presents several methods for reviewing the Scenarios. <br />Total Comparison <br />The two tables on page 4 compare the total employment and population for each Scenario <br />with the Baseline SE Data (the data approved by the TAC for use in the 2035 LRTP <br />development and that is based on the current land use plans and policies of the jurisdictions). <br />The tables demonstrate that the overall totals for the Travel Corridor and Transit Nodes <br />Scenarios remain equal to the Baseline SE Data, and that the Buildout and Constrained <br />Scenarios show expected increases and decreases, respectively, compared to the Baseline SE <br />Data. <br />5-3 <br />