Orange County NC Website
pRq~' SCHOOL IMPACT FEES: CtlAeet Hiu.-CazRSOeo Cmr Sctioots <br />Orange County, North Carolina <br />Figure 7. Chapel Hill-Carrboro City High Schools <br />HIGH SCHOOLS Official <br />Irmenton,/, Errroliment, acrd Utilization Site Building Portables SY 06-07 Level of <br />F~riRm Acreaue Square Feet Classrooms Enrollment C1j Capacity Service <br />Carrboro High [2] 62.3 148,073 0 na 800 na <br />Chapel Hill High [3] 85.3 259,869 17 1,778 1,520 117% <br />East Chapel Hill High 74.8 258,985 8 1,742 1,515 115% <br />TOTALS 222.4 666,877 25 3,520 3,835 92% <br />Demand <br />Units Sife Building Portables <br />Hiorr Rrhnnl r.mvla of Srrrrice (Students) Acreaxe Square Feet Classrooms <br />--o-- , <br />LOS based on Current Enrollment <br />3,520 <br />0.063 <br />189 <br />0.0071 <br />LOS based on Capacity 3,835 0.058 173 0.0065 <br />LOS"based on Adopted LO5 Standard (110%n? '1,279 Q:052 '158 0.0059 <br />Notes to Tabie: <br />(1j Does not include CHCCS students aftending the Hospital Schaal. <br />[27 Carrboro HS opening for 2007-08; capacity is included in level of service calculation <br />(3j Includes the Phoenix Academy <br />Source: Orange County; CHCCS <br />SCHOOL CONSTRUCTION COSTS <br />TischlerBise analyzed costs for school construction in. the Chapel Hill-Carxboro City School <br />System. Costs for completed and planned school projects in CHCCS were provided by the <br />Orange County Budget Office and CHCCS. TischlerBise adjusted previous costs to current <br />(200 dollars, where appropriate, using Marshall Valuation Service Comparative Cost <br />Multipliers.6 Planned project costs are shown in current dollars. Current school costs represent <br />the average costs to construct elementary, middle, and high schools in the CHCCS System. As <br />shown in Figure 8, construction costs average between $221 and $225 per square foot. <br />Specifically, the costs are as follows-Elementary: $221.44 per square foot; Middle: $224.99 per <br />square foot; and High: $223.62 per square foot. <br />e Marshall Valuation Service (Marshall & Swift/Boeckh, LLC) Comparative Cost Multipliers are used to convert <br />historical costs to present-day costs. The published indexes and multipliers are specifically for construction costs <br />taking into account costs of building materials and labor. Multipliers used for CHCCS are for Raleigh, NC and for <br />Class C properties (buildings with masonry or concrete exterior walls and wood or steel roof and floor structures, <br />except for concrete slab on grade). <br />TISChIer~~Se 15 <br />f{se6, [ciri°miear.Piinnhie C:.nsuttanli- <br />