Orange County NC Website
TRIANGLE J COUNCIL OF GOVERNMENTS <br />4307 Emperor Boulevard, Suite 110 <br />Durham, NC 27703 <br />W o r l d <br />Mailing Address: PO Box 12276 <br />Research Triangle Park, NC 27769 <br />~,laS5 <br />919.549.0551 FAX: 919.549.9390 <br />Region www.t]cog.dst.nc.us <br />Jordan Lake Allocation Process <br />This document is intended to provide a general outline of the process for the Jordan Lake <br />Partnership to obtain new or increased Jordan Lake water supply storage allocations from the <br />Environmental Management Commission. The outline factors in the relationship between the <br />allocation process and the development of a western intake facility on Jordan Lake. <br />Develop a Regional Water Supply Plan <br />• include all current Jordan Lake allocation holders <br />• include all water systems connected to current Jordan Lake allocation holders <br />• consists of water use demands projected to the year 2060, broken down by sector of use <br />• consists of currently available water supplies and their capacities <br />• consists of water supplies that are currently being developed and their capacities <br />• identifies western Jordan Lake intake and its equity partners <br />Submit a Formal Letter of Request for Jordan Lake Allocations <br />• submit letter to the EMC and to DWR <br />• include summary of Regional Water Supply Plan <br />• describes the regional Jordan Lake Partnership <br />Develop Jordan Lake Allocation Applications <br />• each water system in the Triangle region will need to file separate applications <br />• each application should reflect information in the Regional Water Supply Plan <br />• each application satisfies the criteria specified by the NC Division of Water Resources <br />Develop Interbasin Transfer Petitions <br />• will be required for the Towns of Cary and Apex, and their associated water systems <br />• may be required for Chatham County <br />• will include an EIS in the case of Cary/Apex and an EA in the case of Chatham County <br />• EMC must decide whether to separate allocation requests involving IBT from those that do not <br />Preliminary Details for a Western Intake Facility <br />• ,capacity of intake and associated facilities related to needs of equity partners, the Regional Water <br />Supply Plan, and Jordan Lake allocations <br />• initial scoping and cost estimate included in Jordan Lake Allocation Applications <br />• preliminary design should be commissioned during Jordan Lake Allocation process <br />• final design and engineering will occur following EMC's decision on Jordan Lake allocations <br />MISSION STATEMENT <br />To serve as an intergovemmenta! organization for local elected officials <br />that works proactively on regional issues in order to sustain and improve the quality of life for our citizens. <br />