Orange County NC Website
3 ~~ <br />• Review of documents requested and provided by Chatham County and <br />OWASA <br />George Lucier said that his understanding is that the Chatham County staff is working <br />with OWASA and other entities to see what needs to be done to facllitate a regional water <br />supply out of Jonian Lake for the western intake. <br />Ed Kerwin said that there has not been n~ent activity on the intake issue, but there has <br />been some work on the other study that was discussed about connections. <br />OWASA Director of Planning Ed Holland said that at the August 14~' meeting, there was <br />information about a small study that OWASA was particlpating in with the City of Dufiam and <br />the Town of Cary. This study is about how the irrterconnections between OWASA, Cary, and <br />Dufiam might be optimized or upgraded for these three jurisdictions. Chatham County <br />expressed an interest in possibly particlpating. There has been some work on this. The <br />discussions were left that Chatham County would not be a formal particlpant in this study, <br />because.some of the information does not exist yet, but they would approach how Chatham <br />County could be served with this interconnection. The work is moving forward. <br />George Lucier left at 6:54 p.m. <br />Ed Kerwin said that this is a very important topic with the drought. Last week's rain only <br />increased OWASA's water supply by less than one percent. It is important to discuss water <br />issues all the time and not just when there is a drought. <br />Charlie Home said that, in his mind, what Chatham County is faced with is riparian. rights <br />and issues surrounding that. He said that Jordan Lake is seen as full and all are going to look <br />at it as the answer to their water problems. <br />Commissioner Jacobs asked what sense of urgency OWASA was getting from the State <br />for n~ional planning for Jordan Lake. Ed Kennrin said that the Governor's Office is taking the <br />strategy seriously, and the Policy Advisor facilitated a meeting last week that he attended along <br />with others to discuss the water crisis and the need for a more unified message about <br />conservation. He said that utilities do not have a simple answer for this. The other issue is <br />funding for regional water systems. <br />Carolyn Efland said that UNC was asked to send copies of its water bills to the State <br />immediately. Today the n:sponsibility was put under Crime Control and Public Safety that the <br />State's emergency response group is now managing the drought. She thinks the message is <br />that the State takes it seriously. She said that right now the reservoir is way lower than it was <br />befon: the 2002 drought, so by next summer, the State could be in dire straits. She is worried <br />that the citizenry does not real'¢e this. She said that there was so much discussion about <br />n:caimed water use, and after the 2002 drought, there was a lot of serious work on it This is <br />just now .under construction and will not be ready until 2009. She said that this is seven years <br />fi om when they really got serious about reclaimed water use. <br />Mayor Chilton said that seven years is good for developing anything of this magnitude. <br />Mayor Chilton made reference to the western irrtake issue and asked, if they were able <br />to work on this together, what kind of timetable would Chatham County need. <br />Charlie Home said that Chatham's need for water will be quicker than Dufiam and <br />OWASA's need, and the timeframe at this point is that Chatham will need it within the next 10- <br />15years. There is an effort now to increase the allocation from Jordan Lake. <br />Mayor Chilton said that Chatham County, OWASA, Orange County, and the City of <br />Dufiam have an allocation from Jordan Lake. <br />Ed Kennrin said that OWASA is working hard to not ever need water from Jordan Lake, <br />but it wants to keep the allocation. Based on the current planning, then: is a greater risk of <br />shortage before the quarry reservoir comes online in the 2030's. OWASA's interest is <br />preserving some future flexibility and minimizing any expense for that <br />