Orange County NC Website
40 <br />We recommend the following notes _a tt. ..fed on the plans prior to issuance c,. _ ~a BEng Compliance Pem~it: "1. Any <br />gate design will include gate retainers. 2. The user will be responsible for opening gates to the dumpster area on <br />collection days of any material(s) to be collected from this location." <br />Blocked Service: <br />We recommend the following note be included on the plans prior to issuance of a Zoning Compliance Permit "If any <br />vehicles are parked in the refuse or recyclables collection vehicle access area, the containers wilt not receive service until <br />the next scheduled collec~on day." . <br />Label Dumpsters: <br />We recommend that the revised plans label each bulk waste con#afner for type of material to be collected. <br />H~ puty Pavin aiver• <br />We recommend the collection vehicle access route to any area containing recyclable material collection containers be <br />paved with ail-weather, heavy-duty pavement OR the following note be included on the plans and recorded on the plat: <br />"Orange County will not be responsible far any pavement damage that may result from service vehicles." <br />Overhead wires: ' <br />We recommend the property owner address refuse service access in relation to the height of any overhead wins at the <br />entrance to the collection area. Any overhead wires must be raised to a minimum of 18'and any other overhead <br />impediment(s) to access wilt need to be raised to a minimum height of 16' or relocated before service vehicles could <br />service any waste through this route. <br />Food/Grease: <br />We recommend that the applican# reserve space for segregated grease renderinglrecyciing collection and consider <br />providing space for segregated food waste collection near the delivery entrance for any building which currently houses, <br />proposes to include or may at some future date incorporate a restaurant, cafeteria, bar, or other food service facility at <br />any time. Commercial grease wastes are not aElowed disposed with regular wastes. <br />MOTES TO BE PLACED ON FINAL PLANS• <br />Construction Waste: <br />~1. By Orange County Ordinance, clean wood waste, scrap metal and corrugated cardboard, ail present in <br />construction waste, must be recycled. <br />2. 6y Orange County Ordinance, all haulers of construction waste must be properly licensed. <br />3. Prior to any demolition or construction activity on the site the applicant will hold apre-demolition/pre-construction <br />conference with the County's Solid Waste staff. This may be the same meeting held with other development <br />officials <br />The Solid Waste Department Staff reviewed the most recent set of plans received and has no further comments at this <br />time. ~ ~ . <br />Please let me know if you need any additional information. <br />~7'.Grant Gale, MPA, CZO <br />Solid Waste Enforcement Supervisor <br />Orange County Solid Waste Management <br />919-918-2942 <br />gctale(r~co.oran .nc us <br />Orange County Landfill <br />1514 Eubanks Rd <br />Chapel Hitt, NC 27516 <br />Ask me about a waste assessment at your constructkxi or project site. Educatk>n Staff fs also available to assist with waste assessments/audlts at your <br />commerofal business. Now can we help? <br />' 04/17/2008 <br />